Laserfiche WebLink
Scope of Work <br /> Sub-task 3A. Aerial Photography and Topo Mapping <br /> Establish ground control and obtain aerial photography encompassing the entire area of <br /> the enlarged Elkhead Reservoir. Prepare a composite base map of the dan^ .d reservoir area <br /> showing photo-identifiable control points and locations and outlines of all .sting structures. <br /> Mapping to 2' contours throughout. including the area of dam and spillway and along Elkhead <br /> Creek to mainstem confluence. <br /> Subtask 3B. Elkhead Dam <br /> Assemble and review data and documents pertaining to the planning, construction, <br /> ownership, and operation of the existing Elkhead Dam and Reservoir. Include review of <br /> construction records, records and documents of the City of Craig, Colorado Division of <br /> Wildlife (CDOW). and Yampa Partners, and designs and estimates in studies prepared by <br /> Harza and Morrison-Knudsen. <br /> Sub-task 3C. Elkhead Recreation Facilities and Use <br /> Assemble and review existing documents, plans, and use data pertaining to recreational <br /> facilities and use at the existing Elkhead Reservoir and-surrounding areas. Include interviews <br /> with relevant City of Craig and State of Colorado officials. Assemble and review recreational <br /> use data for other Yampa River basin reservoirs, for Taylor Draw Reservoir, for Lake Avery, <br /> and for Flaming Gorge Reservoir. <br /> Sub-task 3D. Environmental Data <br /> Locate. assemble. and review existing data and mapping of the reservoir area describing <br /> soils and geology, vegetation. wetlands and tloodplains. wildlife, cultural resources. visual and <br /> scenic attributes, air quality, land use. and socioeconomic characteristics. Locate, assemble, <br /> and review existing data for Elkhead Creek and the Yampa River describing water quality and <br /> fisheries. <br /> Sub-task 3E. Meetings <br /> Prepare for. participate in. and document discussions of necessary TSG meetings to <br /> carry out Task 3 up to a total of 16 man-hours. <br /> Sub-task 3F. Task Memo <br /> Prepare a summary memorandum describing activities and findings of Task 3 for review <br /> by the TSG. Prepare a bibliography of all relevant documents and data sets reviewed. <br /> TASK 4: DAM AND RESERVOIR INVESTIGATIONS <br /> The objective of this task is to gather the physical data necessary to examine the <br /> remaining technical feasibility issues and to refine the configuration of the proposed <br /> enlargement of the Elkhead Dam and Reservoir. This task will provide the basic information <br /> for addressing the project's configuration in Task 5 and it's economic feasibility and <br /> development schedule in Task 8. and will form the basis for design of the project in the future <br /> phases. <br />