My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150314 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150314 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 12:06:41 PM
Creation date
3/5/2014 9:05:51 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-019
C150314
Contractor Name
Farmers High Line Canal and Reservoir Company
Contract Type
Loan
Water District
7
County
Adams
Jefferson
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibilitc Shide <br />Farmers' High Line Canal and Reservoir Company <br />October 2010 <br />HYDROLOGY AND WATER RIGHTS <br />Total water delivered through the Farmers' High Line Canal averages approximately 24,000 acre- <br />feet per year. The Canal typically diverts March 20 through November 10. The FHL has the <br />following water rights on Clear Creek, a tributary to the Sotrth Platte River: <br />Clear Creel� Approprixtion Rxte Cumulati�-e Rxte <br />Priorit�� No. Date (cfs) (cfs) <br />1 2/2�/1860 0.275 0.275 <br />� �/16/1860 1.000 1.275 <br />5 5/31/1860 3.281 �.556 <br />9 7/1/1860 29.800 ��.356 <br />�0 5/28/1863 1.610 45.966 <br />32 6/20/186; 2J�0 48.716 <br />�2 �/23/1865 2.890 SL606 <br />�8 11/2/1865 0.807 52.�13 <br />5� 5/2�/1870 0.330 52.713 <br />�7 �/1/1872 1�4.000 206.7-�3 <br />68 �/1/1886 191.000 397.7�3 <br />69 �/23/1895 335.860 733.603 <br />PROJECT DESCRIPTION AND ALTERNATIVES <br />Aging stnictures along the Canal need to be repaired. The degree of repair ranges from minor <br />modifications to full replacement. I�I some cases modernization of equipment is required. To help <br />identify which items were necessary two studies were performed: a canal evaluation and the <br />Farmers' High Line Master Plan. The results of the canal evaluation were reported in the <br />September 4, 2008 memoranduin. Canal modifications were outlined in the Farmers' High Line <br />Canal Master Plan, dated November 4, 2009. Key structures which were identified to be in need of <br />repair include: <br />■ Club Crest storm drain crossing <br />■ The headworks on Clear Creelc <br />■ The Van Bibber Creelc siphon <br />■ The Ralston Creelc siphon <br />■ Burlington Northern Railroad siphon <br />■ Tree removal <br />Alteri7atives evaluated to address repair of each of these stn�ctures is presented below. <br />Club Crest Storm Drain Crossin� <br />Because the culvert near Carr Street and the Club Crest neighborhood was exposed ii7 the invert of <br />the canal and in an advanced state of deterioration, immediate repair was necessary. The two <br />options involved: <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.