Feasibilitc Shide <br />Farmers' High Line Canal and Reservoir Company <br />October 2010 <br />Tree Removal <br />Numerous large cottonwood trees have become obstructions to maintenance and potential hazards <br />to the integrate of the Can al. The trees present a hazard as falling trees can displace a significant <br />portion of the ditch. The decomposing tree root systems can also promote seepage pathways <br />through the embanlallent soils. <br />Estimates to remove the trees were provided by tree service companies. The average quote for the <br />worlc was $126,000. <br />COST ESTIMATE <br />The estimated cost for the project, including the two studies and CMP improvements already <br />performed, as well as the tree removal, totals $1,551,218.89. Tables 1 through 8 attached provide a <br />detailed Engineer's Opinion of Costs for the repair of stn�ctures. A summary of the cost is <br />presented below: <br />Item Estimated Estimated <br />No. Description Construction Engineering Tot�l <br />1 Canal E�Taluation $ - $ 29,69�.d9 $ 29,69�.�19 <br />2 FHL Canal Master Plan $ - $ 109,034.00 $ 109,034.00 <br />� CMP drainage pipe replacement at Club $ �9.613.�10 $ 6.878.00 $ 66,491.40 <br />Crest <br />4 Van Bibber Creel� Siphon shuchare repair $ 101.000.00 $ 13,000.00 $ 114,000.00 <br />� Ralston Creelc Siphon repair and partial $ 83.000.00 $ 10,000.00 $ 93.000.00 <br />replaceinent <br />6 Burlington Northern RR Siphon repair and $ 7,000.00 $ 1,000.00 $ 8.000.00 <br />erosion control <br />7 FHL Headgate rieer gate shuch�re $ 311.000.00 $ �9.000.00 $ 3�0.000.00 <br />rehabilitation and gate replacement <br />8 FHL Headgate erosion control $ �4.000.00 $ 7.000.00 $ 61,000.00 <br />9 FHL Headgate SCADA control s��stem $ 74.000.00 $ 9.000.00 $ 8�,000.00 <br />10 Diversion Dam erosion control $ 283.000.00 $ 3�.000.00 $ � 18,000.00 <br />11 Di��ersionDamrehabilitation $ 172,000.00 $ 21,000.00 $ 193,000.00 <br />12 Tree Removal $ 126,000.00 $ - $ 126,000.00 <br />TOTAL $ 1.270,613.40 $ 280.60�.�49 $ 1,i�1,218.89 <br />IMPLEMENTATION SCHEDULE <br />D&A is expected to complete the design with technical back-up for submittal to CWCB by <br />September 201 l. Once approval to proceed is obtained by the CWCB, construction will begin as <br />soon as the Canal is taken out of service during the winter of 2011 to 2012. <br />PERMITTING <br />The Company must obtain authorization from the U.S. Ariny Corps of Engineers (USACOE) to <br />perform the worlc in the River and the CanaL It is anticipated that this project will be deternuned to <br />be exempt from USACOE regiilations or the project may fall under the maintenance portion of a <br />-13- <br />