My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150188 Legal Corespondance
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150188 Legal Corespondance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:08:46 AM
Creation date
3/4/2014 11:35:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150188
Contractor Name
Bull Creek Reservoir
Contract Type
Loan
County
Mesa
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.a.41 <br /> WATER RESOURCE CONSULTANTS, LLC <br /> March 14, 2005 HAND DELIVERY <br /> Garrett Jackson, P.E. <br /> Colorado Division of Water Resources <br /> Grand Junction Dam Safety Office <br /> 2754 Compass Drive#175 <br /> Grand Junction, Colorado 81506 <br /> RE: Construction File No. C-1877 <br /> Bull Creek Reservoir No. 4 Submittal <br /> Dear Mr. Jackson, <br /> Per our meeting in Grand Junction March 3, 2005, please find enclosed one set of review <br /> documents required for design review for the rehabilitation of Bull Creek Reservoir No. 4. By way <br /> of this transmittal letter, we are also hand delivering one full set of review documents to John Blair <br /> of Division 5 in Glenwood Springs. <br /> These documents are being submitted in response to Mr. Mark Haynes initial review letter of <br /> February 4, 2005, and to comply with requirements of Rule 5 of the "Rules and Regulations for <br /> Dam Safety and Dam Construction." The submittal includes: <br /> 1) The Owner's written authorization allowing myself to sign on behalf of the Bull Creek <br /> Reservoir Power and Canal Company in matters concerning the rehabilitation of Bull <br /> Creek Reservoirs Nos. 1, 2 and 4, dated March 12, 2005(attached). <br /> 2) A hydrology report in accordance with Rule 5.A(7); <br /> 3) Updated construction drawings per Rule 5.A.(2); <br /> 4) Contract documents and Construction Specifications in accordance with Rule 5.A.(3); <br /> and <br /> 5) By reference, the geotechnical report, prepared in accordance with Rule 5.6.(A), which <br /> was previously submitted to your office February 23, 2005. <br /> To expedite your review, the attached Table 1 highlights pertinent design and construction <br /> considerations and issues. <br /> Please do not hesitate me with questions which may arise. <br /> Sincerely, <br /> WATER RESOURCE CONSULTANTS, LLC <br /> Paul C. Currier, P.E. <br /> PCC/pcc <br /> 295-1.0 Transmittal to Garrett 03-14-2005.doc <br /> 244 Hutton Ave., Rifle, CO 81650 PH/Fax(970)625-5433 pcurrier @bwn.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.