My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150365 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150365 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 3:53:49 PM
Creation date
3/3/2014 4:16:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-006
C150365
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
20
County
Hinsdale
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 5—SCHEDULE OF EXISTING DEBT <br /> The BORROWER has an existing loan with the Colorado Water Conservation Board, <br /> Contract #C150350, in the original amount of $1,405,163, with annual payments of <br /> $60,604 with an interest rate of 1.75% per annum and a term of 30 years. The loan <br /> has an estimated maturity date of 2047 and is in good standing. <br /> SECTION 6 -COLLATERAL <br /> The COLLATERAL provided for this loan, as evidenced by the DEED OF TRUST, in the <br /> form attached as APPENDIX 5 and incorporated herein, shall be a pledge of <br /> assessment revenues backed by a rate covenant and an undivided one hundred <br /> percent (100%) interest in the Continental Reservoir and associated storage rights, <br /> as more particularly described in the attached DEED OF TRUST ("COLLATERAL"). <br /> SECTION 7—ADDITIONAL CONDITIONS &CONTRACT REQUIREMENTS <br /> None <br /> SECTION 8—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. Engineering contracts, plans and specifications must be submitted to the CWCB <br /> staff for verification of compliance with the terms of this CONTRACT when available <br /> prior to bidding. Any modifications to the plans and specifications must be approved <br /> in writing by the CWCB staff. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br /> § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br /> Engineer's Office prior to construction. <br /> D. CWCB staff must be present at bid opening and must approve the award of the <br /> construction contract. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> capable construction firms, which said construction firms shall be selected by the <br /> BORROWER and found acceptable by the CWCB staff. <br /> F. The BORROWER must provide a copy of the executed construction contract <br /> documents consisting of the contractor's proposal, construction contract, <br /> performance bond, payment bond, notice of award, notice to proceed, sample <br /> change order, and sample field order, as well as the advertisement for bid and bid <br /> bond at bidding. After the CWCB staff verifies that these documents comply with <br /> the terms of this CONTRACT, the BORROWER may issue the notice to proceed to the <br /> construction firms. <br /> G. The BORROWER shall conduct a pre-construction conference at which time the <br /> CWCB staff shall have the opportunity to review and approve the construction <br /> schedule. <br /> Appendix 1 to Loan Contract C150365 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.