Laserfiche WebLink
K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills <br /> are due. <br /> SECTION 9—ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statements, and <br /> otherwise complying with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, including the <br /> obtaining of all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. <br /> F. Actual construction as called for in the design documents and in change orders <br /> approved by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and <br /> construction management for CWCB-approved change orders. <br /> H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the <br /> CONTRACT. <br /> I. Legal services for reviewing engineering services contracts, reviewing this <br /> CONTRACT, reviewing construction contract documents, and for complying with all <br /> federal, state, and local regulatory requirements. <br /> J. PROJECT-related expenses incurred prior to the Effective Date of this CONTRACT in <br /> accordance with the approval of this loan. <br /> 10—DISBURSEMENT SCHEDULE <br /> For Project costs: The BORROWER shall prepare a periodic progress report which <br /> contains a statement of the PROJECT costs expended for that period and shall <br /> forward said statement to the CWCB. After receipt of the periodic progress report <br /> from the BORROWER, and review and acceptance of the items therein as eligible <br /> expenses as described below, the CWCB will pay to the BORROWER the amount set <br /> forth in the report or such portion that has been approved by the CWCB. Such <br /> payment shall be made within thirty (30) days from the CWCB's approval of each <br /> progress report. <br /> SECTION 11 —TIME FOR PERFORMANCE <br /> PROJECT Beginning: Upon Effective Date of this CONTRACT (the date this <br /> CONTRACT is signed by the State Controller or his designee) <br /> PROJECT Finish: Three (3) years from the Effective Date of this CONTRACT <br /> Appendix 1 to Loan Contract C150378 <br /> Page 4 of 4 <br />