My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150376 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150376 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:56:09 AM
Creation date
2/26/2014 11:56:09 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150376
Contractor Name
Ish Reservoir Company
Contract Type
Loan
Water District
6
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Colorado Water Conservation Board <br /> Emergency Funding for Damaged River Diversions/Dams <br /> from the September 2013 Flood Event <br /> Emergency Loan Application and Feasibility Study <br /> Prepared for and Prepared by <br /> Ish Reservoir Company <br /> PO Box 159 <br /> Johnstown, CO 80534 <br /> 970-535-4531 <br /> Signature <br /> Return a signed hard copy and an electronic copy to: <br /> Jill A. Baty/Company Secretary CWCB Finance Section <br /> 1580 Logan, Suite 600 <br /> Compl = yrritle(Print) Denver, CO 80203 <br /> Attn: Anna Mauss <br /> arm ■ . l ;— - 0 - Ph. 303.866.3441x 3224 <br /> Signet.re/Date e-mail: anna.maussestate.CA.us <br /> Application Deadlines: <br /> October 16, 2013(noon) FEASIBILITY STUDY APPROVAL <br /> Pursuant to Coo rrc!.-,;Rov■ssei:�tetutes 37-60-121&122,and <br /> November 1, 2013(noon) in accordance,: wail plicio5 ;opted by the Board, the <br /> CWCB tall has determined this,Feasibility Study meets all <br /> appli f':r= erner2s for approval. <br /> �, /Iii. , /0 if/f3 <br /> Si.ed Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.