Laserfiche WebLink
The approxirsate line of said ditch is as follows: <br />Beginning at the headgate of the Boulder and <br />Larirer County Irrigating and Manufacturing Ditch <br />Co—pany in the Northeast c~uarter of Section One <br />(1),Township 3 North,Range 70 West,running <br />thence Easterly across said Northeast Quarter of <br />said Section One (1);thence over and across the <br />South Half of the North Half of Section Six (6), <br />the North Half of Section Five (5),and Northwest <br />Quarter of the Northwest Quarter of Section Four <br />(4),all in Township 3 North,Range 69 West,in <br />Boulder County,Colorado,terminating at point of <br />intake into said reservoir in the North Half of <br />Section Three (3),Township 3 North,Range 69 West <br />in Boulder County,Colorado. <br />The irrigation ditch operated by this Corporation corimen <br />ces 1824.93 feet South 59°27’52~West of the Southwest corner of <br />the Southeast Quarter of Section 34,Township 4 North,Range 69, <br />West of the 6th P.M.;then proceeding along a line described <br />approximately as follows: <br />North 7000124*West 19.64 feet;thence R 25 feet, <br />D 68°5l’20~L 30.04 feet T 17.14 feet;thence North <br />01009t04w West 299.57 feet;thence R 150 feet <br />D52°42’53 L 138.O1M T 74.32’;thence North 5133’49 <br />East 443.82 feet;thence R 200’D 37°27’43”L 130.77’ <br />T 67.82 ‘;thence North 89°0l’32 East 96.09 feet; <br />thence R 175’D 23°3653~L 72.13’T 36.58’;thence <br />North 65°24’39”East 338.79 feet;thence R 365’ <br />D 27°52’l3”t.177.55’;thence R 365’D 41053.03m <br />L 266.82’T 139.69’;thence R 365’D 14°00’SO <br />L 89.27’;thenèe South 72°42’18”East 80.59 feet; <br />thence R 145’D 38°11’37”L 96.66’T 50.20’;thence <br />North 69°06’O5~East 464.94 feet;thence R 225’ <br />D68°57’42”L 270.81’T 154.53’;thence South 41°56’13’ <br />East 477.78 feet;thence R 250’D 40000~17M L 174.55’ <br />T 91.00’;thence South 8l056~30I East 385.98 feet; <br />thence R 230’D 09°51’23 L 39.57’T 19.83’;thence <br />R 250’D 20°18’48~L 88.63’T 44.79;thence N 87°36’O5~ <br />East 1043.10’;thence R 800’D 05°47’47”L 80.93’ <br />T 40.50’;thence North 8104818M East 562.34 feet;thenc~ <br />R 225 D 88°22’47”L 347.07’T 218.72’;thence North <br />06°34’29”West 145.19 feet;thence R 225’D 88°22’47” <br />L 347.07’T 218.72’;thence North 06°34’29”West <br />145.19’;thence R 117.05’D 98°05’22”L 200.39’T 134.86 <br />thence South 88°29’07”East 426.60’thence R 250’ <br />o 84°14’04”L 367.54 T 226.03’;thence North 07°16’49” <br />East 386.45 feet;thence R 150’D 17°21’12”L 45.43’; <br />thence R 150’D 47°14’08”L 123.66’T 65.59’;thence <br />North 39°57’19”West 268.34 feet;thence R 775.25’ <br />0 28°34’07”L 386.55’T 197.38;thence North 68°31’26” <br />West 106.20 feet;thence R 75 D 95°50’33”L 125.46’ <br />T 83.07’;thence North 27°19’07”East 314.35 feet; <br />thence R 375 0 23°21’32”L 152.88’T 77.52’;thence <br />North 50°40’39”East 220.27 feet;thence R 174.32’ <br />0 4Qo57143~L 124.63’T 65.11’;thence South 88°21’38” <br />East 282.62 feet;thence R 123.73’0 18°07’14”L 39.13’ <br />T 19.73’;thence South 70°14’22”East 135.18 feet; <br />more or ~t.o its point of termination. <br />DATED this 23rd day of February,1980. <br />Witness Rog~L.C≤bbon~,President of <br />T1-,.~iPr~,,1 ~~T ~rf mpr (‘r,iint’ir