My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150370 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150370 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2015 4:27:28 PM
Creation date
2/26/2014 11:53:38 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-008
C150370
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Emergency Loan Application and Feasibility Study [LEFT HAND DITCH COMPANY] Page | 14 <br /> <br />• Evaluate and install possible flood mitigation measures to prevent future damage. <br />• Evaluate and install possible fish passage structures to enhance the ability of fish to move <br />through the structure. <br /> <br />Crocker Ditch <br />• Restore Left Hand Creek to its pre-flood channel in this area. <br />• Remove debris from ditch. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br />• Evaluate and install possible flood mitigation measures to prevent future damage. <br />• Evaluate and install possible fish passage structures to enhance the ability of fish to move <br />through the structure. <br /> <br /> <br />Allen's Lake Filler Canal Head Gate (Also Lake Ditch inlet and Toll Gate Ditches headgate) <br />• Survey and design new dam and headgate structure. <br />• Replace diversion dam and headgate structure. <br />• Coordinate with Boulder County Transportation when road and diversion dam work takes <br />place. <br />• Perform grade survey to determine if the Parshall Flume is still useable. <br />• Replace Parshall Flume if necessary. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br />• Replace upper section of the ditch. <br />• Remove debris from ditch. <br />• Evaluate and install possible flood mitigation measures to prevent future damage. <br />• Evaluate and install possible fish passage structures to enhance the ability of fish to move <br />through the structure. <br /> <br /> Allen's Lake Filler Canal at Geer Canyon Road <br />• Replace culvert where ditch crosses Geer Canyon at road. <br />• Remove debris in this area. <br /> <br />Table Mountain Ditch <br />• Survey and design new dam and headgate structure. <br />• Remove destroyed and unusable diversion dam and headgate structure. <br />• Replace diversion and headgate structure. <br />• Ensure measuring device operates to State Engineer’s Office Standards. <br />• Restore Left Hand Creek to its pre-flood channel in this area. <br />• Repair ditch. <br />• Remove debris in ditch. <br />• Evaluate and install possible flood mitigation measures to prevent future damage. <br />• Evaluate and install possible fish passage structures to enhance the ability of fish to move <br />through the structure. <br /> <br />Bader Ditch <br />• Survey and design new dam and headgate structure.
The URL can be used to link to this page
Your browser does not support the video tag.