My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150365 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150365 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:23:10 PM
Creation date
2/26/2014 11:51:40 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150365
CT2015-006
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
20
County
Hinsdale
Mineral
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTIONTHREE Background Information <br /> 3-4 <br /> <br />Table 3.2: Summary of Diversion Water Rights <br />Diversion Point Amount (cfs) <br />Santa Maria Supply Ditch – North Clear Creek 150 <br />Santa Maria Supply Ditch – Bennett Creek 25 <br />Santa Maria Supply Ditch – Boulder Creek 100 <br />Total 275 <br />3.6 ENGINEERING INVESTIGATIONS AND DESIGNS <br />The Project has been finalized and the SMRC has approved the designs. Bid documents <br />will need to be developed for the Project prior to soliciting bids. <br />Engineering analyses including geotechnical, hydraulic, and structural were completed in <br />support of preliminary and final designs to meet SEO requirements. A Project topographic <br />survey completed by URS in 2011 was used to design the Project components. <br />
The URL can be used to link to this page
Your browser does not support the video tag.