Laserfiche WebLink
SECTIONTHREE Background Information <br /> 3-4 <br /> <br />Table 3.2: Summary of Diversion Water Rights <br />Diversion Point Amount (cfs) <br />Santa Maria Supply Ditch – North Clear Creek 150 <br />Santa Maria Supply Ditch – Bennett Creek 25 <br />Santa Maria Supply Ditch – Boulder Creek 100 <br />Total 275 <br />3.6 ENGINEERING INVESTIGATIONS AND DESIGNS <br />The Project has been finalized and the SMRC has approved the designs. Bid documents <br />will need to be developed for the Project prior to soliciting bids. <br />Engineering analyses including geotechnical, hydraulic, and structural were completed in <br />support of preliminary and final designs to meet SEO requirements. A Project topographic <br />survey completed by URS in 2011 was used to design the Project components. <br />