My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150321 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150321 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:04:39 PM
Creation date
2/26/2014 11:43:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-055
C150321
Contractor Name
Georgetown, Town of
Contract Type
Loan
Water District
7
County
Clear Creek
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
December 2007 Georgetown – Final Alternatives Analysis Report <br />page 8 <br />7.0 Recommendation <br />As a result of the information presented in this report along with the supporting review documents, <br />Alternative 3, Bypass around dam, appears to be the best overall choice. TCB recommends that this <br />alternative be pursued for design. Construction of this alternative offers the following advantages over the <br />other alternatives: <br />x Alternative 3 is least likely to be influenced by currently unconfirmed factors. <br />x Alternative 3 uses traditional construction techniques. (No underwater construction or special <br />concrete removal) <br />x Alternative 3 removes the project from the State Engineer’s Office jurisdiction (because it is <br />completely separate from the dam). <br /> In order to pursue Alternative 3 for design, TCB recommends the following steps be taken: <br />x Perform a detailed geotechnical investigation along the proposed pipe alignment. <br />x Perform a detailed utility survey to locate all existing utilities along the pipe alignment. <br />x Inquire with the hydro plant owner about potential removal of the siphon. If so, include a bifurcation <br />in the bypass pipe through the dam to be connected to the hydro plant. <br />x Perform a detailed engineering design of the alternative.
The URL can be used to link to this page
Your browser does not support the video tag.