Laserfiche WebLink
December 2007 Georgetown – Final Alternatives Analysis Report <br />page i <br />Contents <br />1.0Introduction.......................................................................................................................1 <br />2.0 Site Specific Information....................................................................................................1 <br />3.0 Existing Features...............................................................................................................1 <br />4.0Alternatives.......................................................................................................................2 <br />4.1Alternative 1 – Slide Gate.....................................................................................2 <br />4.2Alternative 2 – By-Pass Pipe Through Dam..........................................................3 <br />4.3Alternative 3 – By-pass Pipe Around Dam............................................................4 <br />5.0Cost Comparison...............................................................................................................5 <br />6.0Comparative Analysis of Alternatives.................................................................................5 <br />7.0Recommendation..............................................................................................................8 <br />List of Figures and Tables <br />Figure 1: Existing Features <br />Table 1: Alternative Advantages and Disadvantages <br />Table 2: Comparative Analysis of Alternatives <br />Appendicies <br />Appendix A: Graphical Representation of Final Alternatives <br />Appendix B: Engineer’s Opinion of Probable Cost <br />Appendix C: Reference Drawings