My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150321 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150321 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:04:39 PM
Creation date
2/26/2014 11:43:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-055
C150321
Contractor Name
Georgetown, Town of
Contract Type
Loan
Water District
7
County
Clear Creek
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page | 13 <br /> <br /> <br />Georgetown Lake Dam Outlet Modification Project – Georgetown Colorado <br />XII. F UNDING R EQUIREMENT S CHEDULE <br />As noted in the Town’s loan application dated 1 March 11, the applicant is requesting a <br />$3,000,000 project loan in association with an overall project pro-forma and forward looking <br />budget of $3,275,000. <br />The pro-forma cash flow demand is modeled as follows. <br />Period Amount <br />August – December 2011 $250,000 <br />January to April 2012 $200,000 <br />April to December 2012 $2,825,000 <br /> <br />Currently the pro-forma schedule assumes engineer/design efforts would commence shortly <br />after receiving CWCB loan commitment. Engineering and design would continue throughout <br />the remainder of 2011 and into the spring of 2012, at which time the project would move into <br />the construction phase with anticipated substantial completion of the Project by the end of 2012. <br /> <br />XIII.F INANCIAL P LAN <br />The Town’s financial plan is to secure financing through CWCB as noted in the Town’s CWCB <br />loan application dated 1 March 11. <br />Through the Vidler Agreement, as noted above, Georgetown and Black Hawk as parties to the <br />agreement are responsible to pay a percentage of any Lake improvements. Georgetown is <br />currently negotiating with Black Hawk in terms of contributing up to 50% of the project costs. <br />The form of that contributions, e.g., whether or not Black Hawk decides to contribute its portion
The URL can be used to link to this page
Your browser does not support the video tag.