My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150321 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150321 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:04:39 PM
Creation date
2/26/2014 11:43:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-055
C150321
Contractor Name
Georgetown, Town of
Contract Type
Loan
Water District
7
County
Clear Creek
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page | 10 <br /> <br /> <br />Georgetown Lake Dam Outlet Modification Project – Georgetown Colorado <br />the creek approximately 100-ft downstream of the existing spillway. The Outlet Study <br />concluded that routing the pipe completely around the dam may reduce or eliminate <br />regulatory agency requirements. In order to route the pipe completely around the dam, <br />the pipe would need to be located in Alvarado Rd. Regulation of flow through the by- <br />pass pipe would be with a 42-inch diameter regulating gate valve at the downstream <br />end of the pipe. The valve would be housed in a valve vault and would discharge into a <br />concrete discharge structure on the bank of the creek downstream of the existing <br />spillway. A bulkhead gate at the intake structure would allow drainage of the pipe for <br />inspection. Based on the topography, it appears that the intake structure could be <br />located between the West side of the reservoir and the East side of Alvarado Road and <br />would consist of a trash-rack, the bulkhead gate, and a bubbler system to prevent ice <br />formation at the stem. <br />The Outlet Study goes into further detail with respect to; <br /> Site Information <br /> Existing Features <br /> Alternate Designs <br /> Cost Comparisons <br /> Comprehensive Analysis of Alternatives <br /> Recommendation <br />The reader is referred to the full report Outlet Study for more details. <br />Recommended Alternative : The Outlet Study recommended Alternative #3, a new bypass <br />around the dam, listing several reasons: <br /> Alternative 3 is least likely to be influenced by currently unconfirmed factors. <br /> Alternative 3 uses traditional construction techniques. (No underwater construction or <br />special concrete removal).
The URL can be used to link to this page
Your browser does not support the video tag.