Laserfiche WebLink
Periods When Stream Flow Stewardship Goal Not Met (District Caused): <br />Date or range of dates when the stream flow dropped below the Stream Flow <br />Stewardship Goal as a result of District diversions. <br />Amount Stream is Below Goal Each Period: Represents the volume of the <br />stream flow that is below the Stream Flow Stewardship Goal as a result of District <br />diversions. <br />Net Storage Required to Meet District Demand and Stream Flow <br />Stewardship Goal: The net amount of raw water storage required to fully meet the <br />District's demands and eliminate all days the Stream Flow Stewardship Goal is not met <br />due to operation of the District's Snowmass Creek Diversions. <br />Net Storage Required to Meet District Demand for 3 Weeks During a <br />Catastrophic Event: The net amount of storage needed to meet the District's in-house <br />demand for three weeks at the particular number of EQRs being modeled. The amount <br />shown reflects an average use per EQR of 275 gallons per EQR per day. <br />Total Net Storage Required: Represents the net amount of storage (excluding <br />seepage and evaporation losses) required to fully meet the District's demands and <br />eliminate all days the Stream Flow Stewardship Goal is not met due to operation of the <br />District's Snowmass Creek diversions, and maintain a storage reserve to meet the <br />District's demand for three weeks for the number of EQRs being modeled. <br />HIGHLIGHTS OF RESULTS <br />The study results are presented in the attached Table 3 for the 1977 study <br />period, and in Table 4 for the 2002 - 2003 study period. <br />Page 19 <br />