My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150315 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150315 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:24:21 AM
Creation date
2/26/2014 11:24:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150315
Contractor Name
Snowmass Water & Sanitation District
Contract Type
Loan
Water District
38
County
Pitkin
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Periods When Stream Flow Stewardship Goal Not Met (District Caused): <br />Date or range of dates when the stream flow dropped below the Stream Flow <br />Stewardship Goal as a result of District diversions. <br />Amount Stream is Below Goal Each Period: Represents the volume of the <br />stream flow that is below the Stream Flow Stewardship Goal as a result of District <br />diversions. <br />Net Storage Required to Meet District Demand and Stream Flow <br />Stewardship Goal: The net amount of raw water storage required to fully meet the <br />District's demands and eliminate all days the Stream Flow Stewardship Goal is not met <br />due to operation of the District's Snowmass Creek Diversions. <br />Net Storage Required to Meet District Demand for 3 Weeks During a <br />Catastrophic Event: The net amount of storage needed to meet the District's in-house <br />demand for three weeks at the particular number of EQRs being modeled. The amount <br />shown reflects an average use per EQR of 275 gallons per EQR per day. <br />Total Net Storage Required: Represents the net amount of storage (excluding <br />seepage and evaporation losses) required to fully meet the District's demands and <br />eliminate all days the Stream Flow Stewardship Goal is not met due to operation of the <br />District's Snowmass Creek diversions, and maintain a storage reserve to meet the <br />District's demand for three weeks for the number of EQRs being modeled. <br />HIGHLIGHTS OF RESULTS <br />The study results are presented in the attached Table 3 for the 1977 study <br />period, and in Table 4 for the 2002 - 2003 study period. <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.