My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150315 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150315 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:24:21 AM
Creation date
2/26/2014 11:24:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150315
Contractor Name
Snowmass Water & Sanitation District
Contract Type
Loan
Water District
38
County
Pitkin
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Application <br />4. Please provide a brief description of the owner's existing water supply facilities and describe <br />any existing operational or maintenance problems. Attach a map of the service area <br />The District receives approx. 96% of its water from its East Snowmass Creek diversion. <br />This water is conveved directl,�to the WTP throu�h a 12" raw water line. At�proximatelv 2% <br />of the raw water comes from the Snowmass Creek diversion and approximately 2°k comes from <br />the West Fork of Brush Creek diversion. <br />For existing facilities indicate: <br />Number of shareholders <br />Current Assessment per share $ <br />Number of acres irrigated <br />or Number of customers served apnrox.. 3500 <br />Number of shares <br />Water Right: CFS. <br />Average water diverted per year: approx. 1.850 acre-feet <br />Part B. - Description of the Project <br />1. Name of the Project Enlar�ent of Gie�ler Reservois _ <br />2. Purpose of this loan application. Check one. <br />New project <br />Rehabilitation or replacement of existing facility <br />X Enlargement of existing facility <br />Emergency Repair <br />Other (describe) . <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />starage restriction order from the State Engineer? YES _ NO <br />4. General locaiion of the project (Please include county, and approximate distaace and direction <br />from nearest town, as we11 as legal description, if known. <br />L.ocated in Pitkin Count�! ,approx. y� mile west of Snowmass Villa�e. L�cat�d in the SW 1 /a <br />of Section 2, Township 10 South. Rang_e 86 West of the 6`� Princinal Meridian, Pitkin County. <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served aad service area. Attach separa[e sheet, if needed. <br />See attack�ed sheec. <br />6. Will the acquisition of additional water rights be necessary? YES <br />If YES, please explain. <br />2 <br />NO X <br />
The URL can be used to link to this page
Your browser does not support the video tag.