My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150313 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
2001-3000
>
C150313 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:21:09 AM
Creation date
2/26/2014 11:21:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150313
Contractor Name
Huerfano-Cucharas Irrigation Company
Contract Type
Loan
Water District
16
County
Huerfano
Pueblo
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Loan Narrative Overview 16 <br />TABOR IMPACTS HCIC is a non-profit mutual irrigation company, incorporated in the State of Colorado, and is not subject to TABOR. BORROWER FINANCIAL CONDITION AND NEED HCIC has no current debt and a small cash reserve as indicated in the most recent financial statements located in Appendix C. The Company’s primary assets are the dam, reservoir, land under and around the reservoir, water rights and the irrigation delivery system. Without this loan, HCIC does not have all the financial resources, even considering the additional equity capital contributions of its largest shareholder Two Rivers, to implement the repair and restoration of the Cucharas Reservoir.
The URL can be used to link to this page
Your browser does not support the video tag.