My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150223 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150223 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:16:38 AM
Creation date
2/26/2014 11:16:38 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150223
Contractor Name
Keenesburg, Town of
Contract Type
Loan
Water District
2
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The information presented in this study follows the general format discussed with <br />the CWCB staff and as outlined in the CWCB's Guidelines for Financial <br />Assistance. <br />The relative locations of all facilities described in this report are shown on the <br />Water Line Alternatives exhibit as Appendix B. <br />B. STUDY OBJECTIVE <br />The following sections provide the necessary background information about the <br />Town's current and future water situation. In addition, information is presented <br />about the financial strength of the Town and its ability to service the debt, which <br />will be associated with the Phase II project. <br />More specifically, this engineering evaluation will include the following: <br />• Description of the project sponsor, anticipated revenues and current <br />operations. <br />• A summary of the existing water supply and the Laramie-Fox Hill water <br />quality issues. <br />• Future water supply requirements. <br />• Water system sizing necessary for transmission lines and lift stations. <br />• Description of alternative water supplies and water transport facilities <br />including piping, pump stations, and storage. These alternatives were <br />developed to determine the least cost alternative for the current expansion <br />and to develop alternatives for future expansions. <br />• Presentation of a preliminary cost opinion for the needed improvement. <br />• Financial analysis of the expected revenues that will be obtained from the <br />Town's water enterprise fund in order to service the debt. <br />C. PROJECT SPONSOR <br />The Town of Keenesburg is the project sponsor for Phase II. Keenesburg is a <br />Colorado statutory town and manages its water utility through an enterprise fund. <br />The Town relies on water sales, tap fees, and property taxes to fund operations, <br />maintenance and expansion of its system. A copy of the budget is included as <br />Appendix D. <br />The Town currently serves approximately 461 water taps and an estimated <br />population of 1100. Water customers within the Town are primarily residential, <br />with approximately 78 other taps, which include commercial, schools, and other <br />public type buildings. The base water rate was recently increased from $18.00 <br />(4,000 gallons) to $22.00 (6,000 gallons) representing a 22% increase. Usages <br />in excess of the minimum 6,000 gallons were also increased utilizing a stepped <br />rate to encourage water conservation. Additional information pertaining to the <br />adopted rates is included in the ordinance. <br />Feasibility Study -Keenesburg, CO <br />1/23/2009 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.