My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150223 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150223 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:16:38 AM
Creation date
2/26/2014 11:16:38 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150223
Contractor Name
Keenesburg, Town of
Contract Type
Loan
Water District
2
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tap fee revenues, as projected, will be required to fund the loan. In the row identified as “dept payment – available revenue”, shows that the Town will require the sale of taps until <br />the year 2014 when the excess revenue from water sales nearly exceeds the debt service. As mentioned above, the Town will need to pass a resolution guaranteeing to cover the debt service <br />with a rate increase should the tap fees not be collected. The most important item indicated in this spreadsheet is the fact that the water fund balance never falls below $295,000. It <br />can also be see that with the tap sales, this balance grows to nearly one half million dollars one year following construction of the replacement well and pipeline. <br />Appendix 1 APPENDIX A Water Supply Evaluation TZA Water Engineering, Inc. <br />Appendix 2 Appendix B Water Line Alternatives Exhibit <br />Appendix 3 Appendix C Cost Opinion, Summary of Water Supply Alternatives <br />Appendix 4 Appendix D 2006 Waterworks Budget <br />Appendix 5 Appendix E Water Fee Resolution <br />Appendix 6 Appendix F 30 Year Financial Detail <br />
The URL can be used to link to this page
Your browser does not support the video tag.