My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150223 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150223 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:16:38 AM
Creation date
2/26/2014 11:16:38 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150223
Contractor Name
Keenesburg, Town of
Contract Type
Loan
Water District
2
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Meeting the annual debt payment will require a combination of revenue from <br />water sales, revenue from tap sales and possibly obtaining revenue from a water <br />rater increase. The Town Board has the authority to implement a water rate <br />increase to meet its debt obligation without the vote of the public. This authority <br />is the result of the Towns water utility being an enterprise utility fund. <br />A 30-year loan for the requested $1,018,080 at a 3.75 percent interest rate <br />results in an annual payment of $57,100. The CWCB requires that the annual <br />payment be increase by ten percent fora 10-year period to create a debt <br />payment reserve. This 10 percent increases the annual debt payment from <br />$57,100 per year to $62,826 per year. A summary of how the dept obligation <br />would be paid in the first year is shown in the table below. <br />Revenue Reauired With DOLA Grant <br />Item Cost Percent of Total <br />Projected Revenue From Water Sales $35,600 56.7 <br />Revenue From $3.66 Rate Increase ($25.66) $20,226 32.2 <br />Revenue From Tap Sales (1 tap) $7,000 11.1 <br />Total Dept Service Required $62,826 100 <br />It can be seen that a rate increase of $3.66 may be required to fund the debt. <br />Comparing the new rate of $25.66 to the state average of $34.68 shows that the <br />Town is in a good position to fund this project. <br />The Town expects to receive approval of the $500,000 grant in July of 2006. <br />Should the DOLA Grant not come to fruition, the Town will need to borrow the <br />$500,000 that it was counting on receiving from DOLA. This would result in the <br />need to borrow $1,518,000 and the annual debt payment would be $93,700, <br />which includes the ten percent annual loan reserve. A summary of how the debt <br />would be paid is as indicated below. <br />Revenue Reauired Without DOLA Grant <br />Item Cost Percent of Total <br />Projected Revenue From Water Sales $35,600 38.0 <br />Revenue From $7.97 Rate Increase ($29.97) $44,100 47.0 <br />Revenue From Tap Sales (2 taps) $14,000 14.9 <br />Total Dept Service Required $93,700 100 <br />The two respective summaries show that the town will require the sale of two or <br />three taps to cover the dept service for the two funding scenarios. With the 80 <br />plus residential units being platted and available for purchase of building permits <br />this year, the Town will most likely be capable of making the annual dept <br />payment and will not need to raise the rates. However, to secure a strong loan <br />position, the Town Board will need to implement a resolution acknowledging the <br />Feasibility Study - Keenesburg, CO <br />1 /23/2009 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.