My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
010000047 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
010000047 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2014 2:57:33 PM
Creation date
2/25/2014 12:27:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
010000047
Contractor Name
Boyle Engineering Corporation
Contract Type
Grant
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Deliverables: Memo describing approach and results for the basinwide modeling effort. This memo <br /> should describe data issues unique to the Yampa model and include calibration results. Command files <br /> and data sets will be delivered. <br /> Task 6—User's guide for the daily model approach <br /> Purpose: Create a generic user's guide based on the approach selected in Task 3 for developing a daily <br /> model from a monthly model, using the method selected in the Yampa basin. <br /> Approach: This task will be undertaken only after written authorization from the State,based on <br /> conclusions of Task 4. Write a document describing the steps,protocol, and tools used to create the daily <br /> Yampa model. <br /> Deliverables: A generic description of the steps required to develop a daily model from a monthly <br /> model. It is expected to be 3 to 5 pages in length. <br /> Task 7—Extended data set tasks <br /> Purpose: The purpose of this task is to complete calibration and documentation of the extended <br /> historical data set for the Yampa and Colorado River Basin Water Resources Planning Models, and to <br /> apply the stochastically generated data set for the Yampa River Basin Model to a specific management <br /> alternative. <br /> Approach: This task will be undertaken only after separate written authorization from the State. The <br /> Yampa and Colorado models will be calibrated using historical streamflow at key gages and historical <br /> contents at key reservoirs. Phase IIIa documentation will be updated to reflect calibration changes, and a <br /> new section on data extension will be provided. The monthly Yampa model will be executed under a <br /> future scenario specified by the state, and comparisons made with a similar analysis using the historical <br /> data set. <br /> Deliverables: Final extended historical data sets for the Yampa and Colorado monthly models, and <br /> documentation for the same; a technical memorandum describing the application of the stochastic data <br /> set to a sample management problem. <br /> Task 8—Management and coordination <br /> Purpose: Allow for adequate time to maintain communication with the State and to manage the project. <br /> Approach: Submit monthly progress reports and invoices to the State. Hold two progress meetings over <br /> the course of Tasks 1, 2, 3, 4, and 7; hold two to four progress meetings over the course of Tasks 5 and <br /> 6. <br /> Deliverables: Monthly progress notes and invoices, minutes from progress meetings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.