My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150093 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150093 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2015 1:15:15 PM
Creation date
2/25/2014 12:26:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150093
Contractor Name
Rio Grande Water Conservation District
Contract Type
Grant
Water District
0
County
Alamosa
Bill Number
HB02-1152
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SUMMARY — RIO GRANDE WCD - CONTRACT C150093 <br /> SECTION 1 -CONTRACTOR INFORMATION <br /> Contractor Name: Rio Grande Water Conservation District <br /> Address: 10900 Highway 160 East <br /> Alamosa Colorado 81101-9518 <br /> Contact: Ray Wright, President <br /> Phone Number: 719-589-5855 Fax Number: 719-589-4331 <br /> Section 2 — PROJECT DESCRIPTION <br /> Description of Project. The PROJECT will consist of the District's participation with the U. S. <br /> Bureau of Reclamation in the rehabilitation (re-drill and re-locate) of several Closed Basin <br /> project wells. The existing wells have lost production capabilities over the past several years <br /> due to draw-down of the aquifer at specific locations and basic wear and tear of well pumps <br /> and appurtenances. The well improvements are designed to reduce the well screen size <br /> and the size of the bore and are intended to insure the system meets the water quality <br /> requirements of the project. The Closed Basin project is located in the San Luis Valley and <br /> operated by the Bureau of Reclamation. The project is a network of groundwater salvage <br /> wells, pipeline laterals, and a conveyance channel designed to salvage unconfined ground <br /> water and available surface flow in the Closed Basin that would otherwise be lost to <br /> evapotranspiration. The project assists Colorado in meeting its' commitment to the states of <br /> New Mexico and Texas under the Rio Grande Compact of 1939, and the United States' <br /> commitment to Mexico under the treaty of May 21 , 1906. The project also provides delivery <br /> of water to the Alamosa National Wildlife Refuge and Blanca Wildlife Habitat Area, <br /> stabilization of San Luis Lake, recreational facilities at San Luis Lake, and fish and wildlife <br /> enhancement. <br /> SECTION 3 —TIME FOR PERFORMANCE <br /> Project Beginning: Upon effective date of this contract <br /> Project Finish: On or before June 30, 2004 <br /> SECTION 4 — DISBURSEMENT SCHEDULE <br /> Disbursement of funds. The CWCB shall disburse funds to the CONTRACTOR to pay for <br /> the costs associated with the PROJECT up to a maximum amount of $200,000 in the <br /> following manner: <br /> a. Statement of costs. During the completion of the tasks, the CONTRACTOR shall <br /> prepare statements of the costs of the PROJECT and submit said statements to the <br /> CWCB for payment. Each statement shall indicate the tasks that have been <br /> performed and the percentage completion of each task by task number as specified <br /> in the Scope of Work. <br /> b. Payment of statements. Upon receipt and approval by the CWCB of each such <br /> statement of costs, the CWCB will, within 30 days from the approval of such <br /> statement, pay to the CONTRACTOR the amount of the statement or such portion <br /> thereof as has been approved by the CWCB. <br /> APPENDIX 1 TO CONTRACT C150094 <br />
The URL can be used to link to this page
Your browser does not support the video tag.