Laserfiche WebLink
�'' <br />I � <br />JOHN UNDEM CARLSON <br />(1940 - 1992) <br />MARY MEAD HAMMOND <br />WILLIAM A. PADDOCK <br />MELANIE KOPPERUD BACKES <br />LEE H. JOHNSON <br />PETER C. FLEMING <br />CARLSON, HAMMOND 8C PADDOCK <br />ATTORNEYS AT LAW <br />TELEPHONE 1303) 861-9000 <br />TELECOPIER (303) 861-9026 <br />' <br />1700 LINCOLN STREET, SUITE 3900 <br />DENVER,COLORADO 80203 <br />November 19, 1992 <br />' <br />' <br />' <br />' <br />' <br />' <br />' <br />� <br />' <br />Mr. William J. Killip, II <br />Special Projects Manager <br />State Board of Land Commissioners <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: San Luis Valley Water Conservancy District <br />Dear Bill: <br />I am writing on behalf of the San Luis Valley Water <br />Conservancy District (the ��District") to request permission to use <br />a portion of the state lands in Section 1, Township 40 North, Range <br />6 East, for the purpose of conducting a groundwater recharge <br />project. Enclosed is a completed permit application and an <br />application fee of $100.00. Please consider this letter as part of <br />and a supplement to the application. • <br />By letter to you dated March 31, 1992, John U. Carlson <br />requested permission for the District to enter upon the above <br />described state lands for the purpose of conducting an <br />investigation of those lands for their suitability to the proposed <br />project. By letter dated April 30, 1992, the Board of Land <br />Commissioners granted the District permission to enter the lands <br />and conduct the investigation. That investigation is now completed <br />and the District desires to move forward with the proposed project. <br />' Enclosed is a letter from John Al1en Davey, the engineer for <br />the District, which explains the scope of the proposed groundwater <br />recharge project. Also enclosed is a sketch of the proposed <br />' project facilities prepared by Mr. Davey. Please consider these <br />items as part of and supplements to the application. They also <br />constitute the findings of the District's investigation conducted <br />pursuant to the earlier permission to enter the land, and are <br />' submitted in compliance with the April 30 letter. <br />The initial phase of the proposed project will be to <br />' reactivate two existing diversions from Lateral Nos. 5 and 5A of <br />the Rio Grande Canal, and to run some recharge water through those <br />laterals into the drainage area. Then, after observing the <br />I � <br />' <br />' <br />recharge rate and verifying that the soils in the area are <br />appropriate for the proposed recharge project, the next phase of <br />the proposed project is to construct the additional diversions and <br />small dams as indicated on the enclosed sketch. <br />A-2 <br />