Laserfiche WebLink
STATE OF COLORADO <br /> Colorado Water Conservation Board <br /> OF COI <br /> Department of Natural Resources Few ; �9z- <br /> 1313 Sherman Street,Room 721 <br /> x ev'�,-,,°1 <br /> Denver,Colorado 80203 G' C <br /> Phone:(303)866-3441 /"-;#Y16\ Y . <br /> FAX:(303)866-4474 9 ;� <br /> www.cwcb.state.co.us <br /> Bill Owens <br /> Governor <br /> Greg E.Walcher <br /> Executive Director <br /> MEMORANDUM Rod Kuharich <br /> CWCB Director <br /> Dan McAuliffe <br /> TO: File Deputy Director <br /> FROM: Mike Serlet, P.E., Chief <br /> Water Supply Planning an Finance Section <br /> DATE: November 3, 2003 <br /> SUBJECT: Colorado River Water Conservation Board <br /> Feasibility Study Loan <br /> Contract#C153582, dated September 7, 1990 <br /> I spoke with Mr. Dan Birch, P.E., Project Development Manager of the Colorado River Water <br /> Conservation District, who manages the planning and construction of all new projects within the <br /> District, to determine that the Juniper Cross Mountain Reservoir project has not progressed past the <br /> feasibility study that was completed in April 1993. <br /> The project is located on the mainstem of the Yampa River downstream of Craig and upstream of <br /> Dinosaur, Colorado. <br /> As of this date, the project to construct the Juniper Cross Mountain dam by the Colorado River <br /> Water Conservation District has not been completed, nor has any work beyond the completion of the <br /> project feasibility been completed. <br /> Therefore, the feasibility study contract #C153582 is closed and repayment will not be required <br /> since the project has not been constructed during the initial 10 year period after the date of the <br /> contract. <br /> cc: Steve Biondo, Section B Accountant <br /> Flood Protection•Water Supply Planning and Finance•Stream and Lake Protection <br /> Water Supply Protection•Conservation and Drought Planning <br />