My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153140 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C153140 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:04:28 PM
Creation date
2/19/2014 3:49:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153140
Contractor Name
Fruita, Town of
Contract Type
Loan
County
Mesa
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LIST OF TABLES <br /> Table Title Page <br /> I-1 Fruita Area Soil Classifications Descriptions I-4 <br /> II-1 Statement of Revenue and Expenditures Compared <br /> to Budget-Water Fund (1974) II-4 <br /> I1-2 Statement of Revenue and Expenditures Compared <br /> to Budget-Water Fund (1975) II-5 <br /> II-3 Statement of Revenue and Expenditures Compared <br /> to Budget-Water Fund (1976) II-6 <br /> III-1 Fruita Water Rights III-8 <br /> III-2 Comparison of Water Rights , Watershed Yields , <br /> and Reservoir Capacity III-10 <br /> III-3 Fire Flow Test Data III-11 <br /> IV-1 Water Produced/Delivered in Water Year 1975 IV-5 <br /> IV-2 Major Commercial Water Users IV-6 <br /> IV-3 Random Samples of Residential Water Usage in <br /> Fruita IV-7 <br /> IV-4 Miscellaneous Water Usages IV-9 <br /> V-1 Quality of Existing Fruita Water Supply V-18 <br /> V-2 Data for Registered Wells V-19 <br /> V-3 USER Groundwater Quality Data V-20 <br /> V-4 Colorado River Water Quality Data Locations and <br /> Types V-21 <br /> V-5 Quality of Ute District Treated Water V-22 <br /> VI-1 Assumptions and Constants Used for Cost Estimates VI-2 <br /> VI-2 Capital Cost Estimates VI-4 <br /> VI-3 Miscellaneous Average Water Costs VI-7 <br /> VI-4 Cost Comparison of Alternatives VI-9 <br /> VII-1 Matrix for Comparison of Alternatives VII-2 <br /> VIII-1 Projected Capital Repayment Schedule at <br /> 4% Interest Rates VIII-5 <br /> ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.