Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION 1 <br /> 1.1 Study Objective and Scope 1 <br /> 1.2 Project Location and Description 2 <br /> 1.3 Project Purpose 3 <br /> 1.4 Project Need 3 <br /> 1.5 Water Rights 4 <br /> 1.6 Comparison of LHR Project with Red Mesa Ward Reservoir Enlargement 5 <br /> 1.7 Report Organization 5 <br /> 2.0 REVIEW OF EXISTING DATA 5 <br /> 3.0 TOPOGRAPHY 7 <br /> 4.0 GEOLOGIC RECONNAISSANCE 7 <br /> 5.0 GROUNDWATER HYDROLOGY 8 <br /> 6.0 REGULATORY AND INSTITUTIONAL ISSUES 9 <br /> 6.1 NEPA 9 <br /> 6.2 T&E Species _ 9 <br /> 6.2.1 Federally Listed Species Considered and Evaluated 9 <br /> 6.2.2 Sensitive Species 10 <br /> 6.2.3 San Juan River Basin Recovery Implementation Plan 10 <br /> 6.2.4 Summary of Conclusions of T&E Species Evaluation 11 <br /> 6.3 Wetlands 11 <br /> 6.3.1 Direct Impacts 12 <br /> TABLE 3 12 <br /> 6.3.2 Preliminary Wetlands Mitigation Plan 12 <br /> 6.3.3 Permitting 13 <br /> 6.4 Cultural Resources 13 <br /> 6.5 Local Consultations 14 <br /> 6.6 Indian Trust Assets 16 <br /> 6.7 Findings of Regulatory and Institutional Investigations 16 <br /> 7.0 WATER QUALITY 16 <br /> 8.0 RESERVOIR OPERATIONS, RIGHTS-OF-WAY, COST AND FINANCING 17 <br /> 8.1 Water Allocation and Reservoir Operations 17 <br /> 8.2 Payment Issues 19 <br /> 8.3 Rights-of-Way 19 <br /> 8.4 Reconnaissance-Level Opinion of Cost and Financing 20 <br /> 9.0 SUMMARY OF FEASIBILITY STUDY FINDINGS 21 <br /> 10.0 PHASE I AND RELATED STUDIES 23 <br />