Laserfiche WebLink
1r <br /> Wright Water Engineers, Inc. <br /> 1666 N.Main Ave..Suite C www.wrightwateccom <br /> Durango,Colorado 81301 e-mail:ebikis®wrightwater.com <br /> (970)259-7411 TEL July 12, 2004 <br /> (970)259-8758 FAX <br /> Via Overnight Mail <br /> Mr. Mike Serlet,P.E. <br /> Chief of Water Supply Planning&Finance <br /> Colorado Water Conservation Board <br /> 1580 Logan Street, Suite 550 <br /> Denver, CO 80203 <br /> Re: Long Hollow Dam and Reservoir Phase I Summary Report <br /> Dear Mike: <br /> Enclosed are 20 copies of the subject report for your Board and staff. This report concludes the <br /> Long Hollow Phase I Feasibility work as set out in a contract between the La Plata Water <br /> Conservancy District (LPWCD) and Wright Water Engineers, Inc. (WWE), which was <br /> performed with grant funding from the Colorado Water Conservation Board. <br /> LPWCD and WWE will present the feasibility study findings to your Board on July 21, 2004 in <br /> Delta, Colorado. <br /> As you will find in the Summary Report, the work that has been completed by WWE and other <br /> contractors,beginning in April 2001, supports the need for the Phase II feasibility study for Long <br /> Hollow Reservoir. If constructed, Long Hollow Reservoir would be instrumental in helping <br /> Colorado meet its obligations under the La Plata River Compact while providing additional <br /> irrigation supply to the Colorado and New Mexico users in the La Plata River basin <br /> Very truly yours, <br /> WRIGHT WAT P F,NGINEERS,INC. <br /> By / <br /> Y / � C �- <br /> 'ric • . Bikis,P.G Peter R. Foster,P.E. <br /> Senior Project Manager Senior Project Engineer <br /> Attachments: Summary Report <br /> cc: Brice Lee, LPWCD,Janice Sheftel, Esq. MBSS, Dan Law, CWR&PDA <br /> E:\Documents\Wwe Wei\2004\991-077\080-110\Task 5\Surmnary Report\Summary Report Red Dot\cover Ietter.doc <br /> DENVER GLENWOOD SPRINGS <br /> (303)480-1700 TEL (303)480-1020 FAX (970)945-7755 TEL (970)945-9210 FAX <br />