My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150390 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150390 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2017 10:32:57 AM
Creation date
2/19/2014 10:23:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150390
CT2017-3944
Contractor Name
Culver Lateral Ditch Company
Contract Type
Loan
Water District
4
County
Boulder
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
forward said statement to the CWCB. After receipt of the periodic progress report <br /> from the BORROWER, and review and acceptance of the items therein as eligible <br /> expenses as described below, the CWCB will pay to the BORROWER the amount set <br /> forth in the report or such portion that has been approved by the CWCB. Such <br /> payment shall be made within thirty (30) days from the CWCB's approval of each <br /> progress report. <br /> SECTION 11 — TIME FOR PERFORMANCE <br /> PROJECT Beginning: Upon Effective Date of this CONTRACT (the date this <br /> CONTRACT is signed by the State Controller or his designee). <br /> PROJECT Finish: Three (3) years from the Effective Date of this CONTRACT. <br /> [THE REST OF THIS PAGE INTENTIALLY LEFT BLANK] <br /> Appendix 1 to Loan Contract C150390 <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.