My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12000000053 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
12000000053 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2014 3:58:48 PM
Creation date
2/5/2014 3:58:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
12000000053
Contractor Name
Highland Ditch Company
Contract Type
Grant
Water District
5
County
Boulder
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
January 4, 2012 <br /> Project: Inundation Mapping for Highland Ditch Company <br /> Vendor: The Highland Ditch Company, P.O. Box 649, Mead, Colorado 80542-0649 <br /> Phone(970) 535-4531, Fax(970) 535-4347, <br /> c/o Jill Batty,Company Manager, Email highlandditch @aol.com <br /> Consultant: Deere&Ault Consultants, Inc., 600 S.Airport Road, Building A,Suite 205, Longmont, CO 80503 <br /> Phone: (303)651-1468, Fax: (303) 651-1469 <br /> c/o Mark A. Severin, P.E., Project Manager, mark.severin @deereault.com, <br /> SCOPE OF WORK <br /> This is a study to perform dam breach modeling of six dams in the Highland Ditch Company's(Company) <br /> system in accordance with the latest Breach Guidelines published by the Colorado Dam Safety Branch.The <br /> level of analysis shall be"Simple" as described in Table 1 of the Guidelines for both the breach modeling and <br /> flood inundation mapping. Flood routing models and inundation mapping shall be based on the USGS 10- <br /> meter Digital Elevation Model (DEM)or best available topographic mapping. Field measurements of <br /> bridges/culverts at critical sections shall be incorporated into the model as necessary. <br /> The limits of the dam breach flood mapping shall extend from each reservoir downstream to where the <br /> breach flood impacts are no longer significant.The inundation mapping downstream from Foothills <br /> Reservoir is expected to extend from the dam down to the St.Vrain River and to the South Platte River with <br /> the emphasis on the reach between the reservoir and 1-25. <br /> The Highland#2 Reservoir has two dams (North Dam and South Dam) requiring inundation mapping <br /> downstream from each.The inundation mapping downstream from the North Dam is expected to extend <br /> from the reservoir down to the Little Thompson River and to the South Platte River. Much of this inundation <br /> mapping follows the same flow path as the recently prepared inundation mapping for Ish Reservoir.This <br /> scope assumes that the base map, survey information, and hydraulic model used for the Ish Reservoir study <br /> will be made available to assist in preparation of inundation mapping for the Highland#2 North Dam. Failure <br /> of the South Dam at Highland#2 Reservoir would result in overland flow from the reservoir through the east <br /> side of Longmont and into the St.Vrain River.The inundation mapping is expected to extend downstream to <br /> 1-25.The City of Longmont has proposed a regional detention pond to the north of Highway 66 that will be <br /> represented in the modeling and the inundation mapping of the failure of the South Dam. <br /> Failure of the dam at Highland#1 Reservoir would flow to the east across 1-25 and into New Thomas <br /> Reservoir.The surcharge storage volume in New Thomas Reservoir is expected to contain the majority of the <br /> flow resulting from a clear day failure of Highland#1.The inundation mapping is expected to extend from <br /> Highland#1 down to New Thomas Reservoir. A blue line will be shown on the mapping illustrating the flow <br /> path from the New Thomas Reservoir spillway down to the South Platte River. <br /> Failure of the dam at Highland#3 Reservoir would generally flow south toward the St.Vrain River located <br /> approximately 2 miles away.The inundation mapping is expected to extend downstream to k25. <br />
The URL can be used to link to this page
Your browser does not support the video tag.