My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12000000053 Foothills Dam Inundation Report
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
12000000053 Foothills Dam Inundation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2014 4:05:47 PM
Creation date
2/5/2014 3:58:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
12000000053
Contractor Name
Highlands Ditch Company
Contract Type
Grant
Water District
5
County
Boulder
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The flood wave will continue down the Saint Vrain Creek drainage and will mostly be contained <br /> within the natural floodplain,but it is expected to inundate several structures and overtop all bridges <br /> in the reach until it converges with the South Platte River. As reported in the effective FEMA Flood <br /> Insurance Study dated September 1999, the 100-year flood in this area is approximately 32,500 cfs <br /> compared to the 4,200 cfs calculated in this report for a Foothills Dam failure. For this reason,the <br /> inundation mapping extent was terminated at Saint Vrain Creek's confluence with the South Platte <br /> River. <br /> FOOTHILLS DAM - 5 - June 15,2012 <br /> INUNDATION MAPPING REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.