My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12000000053 Highland No. 2 Dams Inundation Report
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
12000000053 Highland No. 2 Dams Inundation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2014 4:03:47 PM
Creation date
2/5/2014 3:58:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
12000000053
Contractor Name
Highland Ditch Company
Contract Type
Grant
Water District
5
County
Boulder
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
equations (collectively referred to as the "empirical equations").1 The empirical equations predict <br /> the average breach width and failure time as a function of depth of water, dam height, and volume <br /> of water stored. For the outlet structure failure scenario the same three empirical methods were used <br /> to calculate failure time, but the average breach width was fixed at 52 feet for the North Dam, and <br /> 54 feet for the South Dam. Comparisons of the breach parameters calculated by each of the <br /> empirical equations for both breach scenarios are shown below in Table 1 and Table 2 for the <br /> North and South Dams, respectively. <br /> Table 1. Highland Reservoir No. 2 North Dam Failure <br /> Comparison of Dam Breach Parameters <br /> Empirical Method Average Breach Width Time of Failure <br /> (feet) (minutes) <br /> GROUND-LEVEL BREACH <br /> Froehlich 122 82 <br /> Von Thun and Gillette 113 80 <br /> USBR 63 13 <br /> BREACH INTO OUTLET CHANNEL <br /> Froehlich 52 64 <br /> Von Thun and Gillette 52 24 <br /> USBR 52 10 <br /> Table 2. Highland Reservoir No. 2 South Dam Failure <br /> Comparison of D am Breach Parameters <br /> Empirical Method Average Breach Width Time of Failure <br /> (feet) (minutes) <br /> GROUND-LEVEL BREACH <br /> Froehlich 89 113 <br /> Von Thun and Gillette 79 157 <br /> USBR 23 5 <br /> BREACH INTO HIGHLAND DITCH <br /> Froehlich 54 86 <br /> Von Thun and Gillette 54 42 <br /> USBR 54 11 <br /> 2.2 Dam Breach Simulation in HEC-HMS <br /> The U.S. Army Corps of Engineers' (USACE)hydrologic modeling computer program HEC-HMS <br /> was used to simulate clear-day piping failures of both of the Highland No. 2 Dams using the breach <br /> parameters estimated by each of the empirical equations. As a conservative measure,the simulation <br /> which produced the greatest peak outflow for each dam was selected for use in the downstream <br /> hydraulic modeling and inundation mapping. <br /> For each HEC-HMS breach simulation the water surface was set at the inlet ditch overflow crest <br /> (gage height 32) at the onset of the breach, and all water above the breach invert was assumed to <br /> drain. For the ground-level failure alternative the assumption was made that the breach would <br /> A fourth empirical method known as the MacDonald&Langridge-Monopolis/Washington State(2007) <br /> method was not considered based on recommendations found in the Guidelines for Dam Breach Analysis. <br /> HIGHLAND NO.2 NORTH AND SOUTH DAMS - 2 - June 15,2012 <br /> INUNDATION MAPPING REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.