Laserfiche WebLink
bridges. Based on the hydraulic modeling in this study the two main I-25 bridges and the frontage <br /> road bridge are not expected to overtop. <br /> As reported in the I-25 frontage road as-built plan set, the 100-year flood at this location is 17,290 <br /> cfs—significantly greater than the 4,700 cfs estimated at I-25 due to a clear-day breach of Highland <br /> No. 3 Dam. For this reason,the inundation mapping extent was terminated at I-25. <br /> HIGHLAND NO.3 DAM - 5 - June 15,2012 <br /> INUNDATION MAPPING REPORT <br />