My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12000000053 Highland N. 3 Dam Inundation Report
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
12000000053 Highland N. 3 Dam Inundation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2014 4:03:00 PM
Creation date
2/5/2014 3:58:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
12000000053
Contractor Name
Highland Ditch Company
Contract Type
Grant
Water District
5
County
Weld
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 2. Highland Reservoir No. 3 Dam Failure <br /> Comparison of HEC-HMS Piping Simulation Results <br /> Empirical Method Time to Peak Peak Outflow <br /> (minutes) (cfs) <br /> GROUND-LEVEL BREACH <br /> Froehlich 169 2,700 <br /> Von Thun and Gillette 83 1,600 <br /> USBR 6* 760 <br /> BREACH INTO OUTLET CHANNEL <br /> Froehlich 95 4,500 <br /> Von Thun and Gillette 26 4,800 <br /> USBR 6 2,400 <br /> *Time of failure predicted in empirical equation was less than 0.1 hours. <br /> Failure time was rounded up to 0.1 hours(6 min). <br /> Of the six methods that were analyzed, the Von Thun and Gillette method with a failure into the <br /> outlet channel resulted in the greatest predicted peak outflow of 4,800 cfs with a time to peak of 26 <br /> minutes. This hydrograph was routed downstream using HEC-HMS through representative reaches <br /> using the Muskingum-Cunge method. The reach descriptions,routing times, and predicted flow <br /> rates are summarized below in Table 3. The HEC-HMS output is attached in Appendix C, and the <br /> full HEC-HMS model is included on the Project CD. <br /> Table 3. Highland Reservoir No.3 Dam Failure <br /> Summary of HEC-HMS Results Downstream of Highland No. 3 Dam <br /> Location Estimated Time from Start Estimated Peak <br /> of Breach Development Flow Rate(cfs) <br /> Peak outflow at breach 0 hr 26 min 4,800 <br /> Mead High School 0 hr 36 min 4,700 <br /> Saint Vrain River/1-25 0 hr 59 min 4,700 <br /> 2.3 Hydraulic Modeling in HEC-RAS <br /> The USACE's water surface profile modeling computer program HEC-RAS was used to create a <br /> steady-state hydraulic model of the area downstream of the Highland No. 3 Dam using the flow <br /> rates and locations shown above in Table 3. Cross-sections of the flow path were developed from a <br /> 2011 USDA 10-meter digital elevation model (DEM)using the HEC-GeoRAS extension in <br /> ArcGIS. <br /> The I-25 main and I-25 frontage road bridges over Saint Vrain Creek were modeled as a single <br /> bridge with opening, bridge deck, and channel dimensions taken from a 2001 as-built plan set for <br /> the frontage road bridge. The plan set also provided bridge hydraulics and 100-year flood data <br /> (17,290 cfs). Based on email correspondence received from the Colorado Department of <br /> Transportation (CDOT) and the Weld County Public Works Department, it is known that this 100- <br /> year event safely passes under the two main bridges and the frontage road bridge. Based on this <br /> information the I-25 and frontage road bridges over Saint Vrain Creek are not expected to be <br /> overtopped due to a clear-day breach of Highland No. 3 Dam,which would result in a peak flow of <br /> 4,700 cfs at the I-25 crossing. <br /> HIGHLAND No.3 DAM - 3 - June 15,2012 <br /> INUNDATION MAPPING REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.