Laserfiche WebLink
HIGHLAND NO. 3 DAM INUNDATION MAPPING <br /> ACKNOWLEDGMENTS <br /> The technical material in this report was prepared by Deere&Ault Consultants, Inc. under the <br /> supervision and direction of the undersigned whose seal as a professional engineer is affixed <br /> below: <br /> ts cv <br /> GZW' Gv,--P <br /> Mark Sev rin, P. '"'"'°°• 4 <br /> rs�O d <br /> l ll l t*‘` <br /> The following members of the Deere &Ault Consultants, Inc. staff contributed to the study and <br /> the preparation of this report: <br /> Project Manager : Mark Severin, P.E. <br /> Project Engineer • Grant Johnson <br /> All technical questions should be referred to Mark Severin, P.E., Deere &Ault Consultants, Inc. <br /> Phone(303) 651-1468, or email mark.severin @deereault.com. <br />