My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12000000053 McIntosh Dam Inundation Report
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
12000000053 McIntosh Dam Inundation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2014 4:02:34 PM
Creation date
2/5/2014 3:58:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
12000000053
Contractor Name
Highland Ditch Company
Contract Type
Grant
Water District
5
County
Boulder
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project: McIntosh 041512 <br /> Simulation Run: Run 1 Reservoir: McIntosh <br /> Start of Run: 01 Jan2012, 00:00 Basin Model: McIntosh <br /> End of Run: 01 Jan2012, 20:00 Meteorologic Model: McIntosh <br /> Compute Time: 16May2012, 08:31:00 Control Specifications: Control 1 <br /> Volume Units: AC-FT <br /> Computed Results <br /> Peak Inflow: 0.0 (CFS) Date/Time of Peak Inflow: 01Jan2012, 00:00 <br /> Peak Outflow: 12197.7 (CFS) Date/Time of Peak Outflow: 01 Jan2012, 01:49 <br /> Total Inflow: 0.0 (AC-FT) Peak Storage : 2589.6 (AC-FT) <br /> Total Outflow: 2570.5 (AC-FT) Peak Elevation : 5074.9 (FT) <br />
The URL can be used to link to this page
Your browser does not support the video tag.