My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150327 Deferral Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150327 Deferral Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:30:30 PM
Creation date
2/5/2014 2:09:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150327
Contractor Name
Big Elk Meadows Association
Contract Type
Loan
Water District
4
County
Boulder
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BIG ELK MEA.DOWS ASSOCIATION <br />P.O. Boz 440 <br />Lyons, CO 80540 <br />January 11, 2014 <br />Kirk Russell, P.E., Chief <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, CO 80203 <br />RE: Loan Contract Number C150327 <br />Loan Payment Defenal Request <br />Deax Mr. Russell, <br />This is a request for a three-year loan payment defenral relative to the above referenced loan agreement between <br />the Colorado Water Conservation Board and Big Elk Meadows Association. The annual loan payment is due <br />February 1, 2012, in the amount of $16,741.47. The totalloan amount was $272,700, and the first payment was <br />made Februazy 1, 2012. <br />Due to the unprecedented flood of September 2013 in the tributaries to the South Platte River, the Association <br />encountered significant hardship and unexpected financial d.ifficulties resulting from the damage incurred by the <br />flood. Big Ellc Meadows Association suffered catastrophic damage to its community. The Association has 160 <br />homes, with a subsiantial number of full-time residents. Following is a list of major damages sustained: <br />• Five dams totally destroyed, including the dam repaired under this loan <br />• Destruction of our domestic water system supplying all homes <br />• Destruction of our County and State access roads <br />• Heauily damaged interior roads <br />• Loss of power distribution <br />• Loss of all connmunications systems <br />The impact, including Meadow Lake Dam, is estimated at $4.5 million to $5.0 million. Dvring the next three <br />years, we will commit our resources to the reconstruction of our lakes and infrastructure. Deferral of this loan <br />payment wou.ld relieve some of our financial burden during this trying time. <br />Your consideration to process this request for a three-yeaz loan payment deferral for Boazd approval wiil be <br />greatly appreciated. Please advise if you need anything else from the Association regarding this matter. <br />Best regards, <br />1 <br />ely, President <br />Board of Directors <br />Big Elk Meadows Association <br />
The URL can be used to link to this page
Your browser does not support the video tag.