Laserfiche WebLink
The 10-year flood at Sheridan Boulevard (8,600 cfs) reported in the Clear Creek FHAD by ICON <br /> Engineering is greater than the 7,000 cfs estimated at this location due to a clear-day breach of <br /> Hyatt Dam. For this reason, the inundation mapping extent was terminated at Sheridan Boulevard. <br /> HYATT DAM - 5 - June 21,2012 <br /> INUNDATION MAPPING REPORT <br />