My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13000000095 Continental Dam Inundation Report
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
13000000095 Continental Dam Inundation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2014 12:21:51 PM
Creation date
2/5/2014 12:21:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
13000000095
Contractor Name
Santa Maria Reservior Company
Contract Type
Grant
Water District
20
County
Hinsdale
Mineral
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT: <br />80.0 <br />22678.0 <br />735.0 <br />18.0 <br />90.0 <br />3.2 <br />2.5 <br />2.0 <br />0.75 <br />Large <br />1814240 <br />215251.0 <br />274.5 <br />235.2 <br />55.2 <br />2.99 <br />283.5 <br />204630 <br />2.61 <br />78.6 <br />1.0 <br />Cubic Yards <br />Feet (In Direction of Flow) <br />Reservoir Surface Area at Hw (As) = <br />Breach side-slope ratio (Zb) = <br />Z(H):1(V) <br />Z(H):1(V) <br />Feet <br />Dam Size Class: <br />Crest width of dam (C) = <br />Feet <br />Z(H):1(V) <br />ESTIMATION OF DAM BREACH PARAMETERS <br />Height of water over base elevation of breach (Hw) = <br />Volume of water stored in reservoir at time of failure (Vw) = <br />Continental Reservoir <br />EARTHEN (COHESIVE) <br />WITH ALL FAILURE TIMES ESTIMATED BY WASHINGTON STATE METHOD <br />Acre-Feet <br />Feet <br />BREACH INPUT PARAMETERS: <br />Select Embankment Type From Drop-Down Menu: <br />Average Breach Width (Bavg) = <br />USING THE MACDONALD & LANGRIDGE-MONOPOLIS OR WASHINGTON STATE METHODS <br />Acres <br />Hours <br />Breach Formation Factor (BFF) = <br />Embankment Volume Eroded (Ver) = <br />Average Dam Width (Wavg) = <br />CALCULATED BREACH CHARACTERISTICS: <br />Height of breach from dam crest to base elevation of breach (Hb) = <br />Slope of upstream dam face (Zu) = <br />Slope of downstream dam face (Zd) = <br />Feet <br />Piping Orifice Coefficient (Cp) =Used To Calculate Peak Discharge Through Piping Hole <br />RESULTS CHECK: <br />Erosion Rate Divided by Height of Water Over Base of Breach (ER/Hw) =If 1.6 < (ER/Hw) < 21, Erosion Rate is Assumed Reasonable <br />Assumes Full Reservoir At Time of Breach <br />Bottom Width of Breach (Bb) =Feet <br />Breach Formation Time (Tf) = <br />Peak Breach Discharge (Qp) =Cubic Feet per Second <br />Erosion Rate (ER), Calculated as (Bavg/Tf) = <br />Average Breach Width Divided by Height of Breach (Bavg/Hb ) =If (Bavg/Hb) > 0.6, Full Breach Development is Anticipated <br />Acre Feet/FootStorage Intensity (SI) = <br />CONTINENTAL MLM-WA.xlsm
The URL can be used to link to this page
Your browser does not support the video tag.