Laserfiche WebLink
Project: Santa MariaSimulation Run: Santa Maria Froehlich <br />Start of Run: 01Jan2013, 00:00Basin Model: Santa Maria <br />End of Run: 06Jan2013, 23:59Meteorologic Model: Clear-day <br />Compute Time: 22May2013, 08:21:11Control Specifications: 6 days <br />Hydrologic <br />Element <br />Drainage Area <br />(MI2) <br />Peak Discharge <br />(CFS) <br />Time of PeakVolume <br />(AC-FT) <br />Santa Maria Reservoir 0 298379.2 01Jan2013, 01:26 40205.9 <br />Dam to Rio Grande 0 293021.6 01Jan2013, 01:37 40205.9 <br />Rio Grande to Creede 0 209373.9 01Jan2013, 03:39 37992.6 <br />Creede to South Fork 0 119791.2 01Jan2013, 06:54 35046.9 <br />South Fork to Del Norte0 75242.9 01Jan2013, 11:28 32644.9 <br />Del Norte to Monte Vista0 48862.8 01Jan2013, 19:58 31095.0 <br />Monte Vista to Alamosa 10 29501.9 02Jan2013, 14:06 27363.6 <br />Alamosa 1 to Alamosa 20 19929.1 03Jan2013, 00:19 24599.9 <br />Alamosa 2 to Alamosa 30 19529.8 03Jan2013, 03:58 23614.5 <br />Alamosa 3 to Alamosa 40 18584.3 03Jan2013, 08:11 22535.2 <br />Alamosa 4 to Alamosa 50 12034.0 04Jan2013, 01:50 19569.4 <br />Alamosa 5 to Conejos/Costill0 9302.6 04Jan2013, 14:59 16973.8 <br />Conejos/Costilla to Lasauses0 7365.4 05Jan2013, 03:54 13971.3 <br />Lasauses to NM 0 6445.7 05Jan2013, 12:49 11529.6