Laserfiche WebLink
PROJECT: <br />30.5 <br />155.3 <br />13.3 <br />15.0 <br />34.6 <br />3.0 <br />2.5 <br />0.3 <br />0.66 <br />Small <br />4736.65 <br />2536.0 <br />110.2 <br />18.0 <br />7.6 <br />0.34 <br />5.1 <br />6912 <br />0.52 <br />53.4 <br />1.8 <br />21.6 <br />2521 <br />10968 <br />Cubic Yards <br />Feet (In Direction of Flow) <br />Reservoir Surface Area at Hw (As) = <br />Breach side-slope ratio (Zb) = <br />Z(H):1(V) <br />Z(H):1(V) <br />Feet <br />Dam Size Class: <br />Crest width of dam (C) = <br />Feet <br />Z(H):1(V) <br />ESTIMATION OF DAM BREACH PARAMETERS <br />Height of water over base elevation of breach (Hw) = <br />Volume of water stored in reservoir at time of failure (Vw) = <br />Droz Creek Dam, DAMID: 110234 <br />EARTHEN (NON-COHESIVE) <br />WITH ALL FAILURE TIMES ESTIMATED BY WASHINGTON STATE METHOD <br />Acre-Feet <br />Feet <br />BREACH INPUT PARAMETERS: <br />Select Embankment Type From Drop-Down Menu: <br />Average Breach Width (Bavg) = <br />USING THE MACDONALD & LANGRIDGE-MONOPOLIS OR WASHINGTON STATE METHODS <br />Acres <br />Hours <br />Breach Formation Factor (BFF) = <br />Embankment Volume Eroded (Ver) = <br />Average Dam Width (Wavg) = <br />CALCULATED BREACH CHARACTERISTICS: <br />Height of breach from dam crest to base elevation of breach (Hb) = <br />Slope of upstream dam face (Zu) = <br />Slope of downstream dam face (Zd) = <br />Feet <br />Volume Eroded in Piping Hole = <br />*Piping Hole Width (D) = <br />Cubic Yards <br />Cubic Feet Per SecondEstimated Peak Discharge Through Pipe = <br />Feet <br />Reservoir Evacuation May Occur Prior to Full Breach Development - Piping Hole Characteristics calculated below. <br />Piping Orifice Coefficient (Cp) =Used To Calculate Peak Discharge Through Piping Hole <br />RESULTS CHECK: <br />Erosion Rate Divided by Height of Water Over Base of Breach (ER/Hw) =If 1.6 < (ER/Hw) < 21, Erosion Rate is Assumed Reasonable <br />Assumes Full Reservoir At Time of Breach <br />Bottom Width of Breach (Bb) =Feet <br />Breach Formation Time (Tf) = <br />SMPDBK Peak Breach Discharge (Qp) =Cubic Feet per Second <br />Erosion Rate (ER), Calculated as (Bavg/Tf) = <br />Average Breach Width Divided by Height of Breach (Bavg/Hb ) =If (Bavg/Hb) > 0.6, Full Breach Development is Anticipated <br />Acre Feet/FootStorage Intensity (SI) = <br />MLM-WAv2.0.xlsm