My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150334 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150334 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2015 12:52:27 PM
Creation date
2/4/2014 4:20:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-044
C150334
Contractor Name
McDonald Ditch Company
Contract Type
Loan
Water District
20
County
Rio Grande
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibility Study for the Plaza Project — Phase 2: McDonald Ditch Implementation Project <br />Section 2 - Previous Studies <br />2.1 The 2001 Study <br />The 2001 Study was prompted by local stakeholders due to a realized deterioration of the <br />historical functions of the Rio Grande. The 2001 Study analyzed the condition of the riparian <br />area and structures along a 91 -mile reach of the Rio Grande from the town of South Fork to the <br />Alamosa — Conejos County line. The 2001 Study was sponsored by the San Luis Valley Water <br />Conservancy District and funded with a $250,000 grant from the Colorado Water Conservation <br />Board (CWCB). The study evaluated the condition of the river's functions as they related to: <br />• The condition of riparian habitat and fisheries; <br />• Accessibility of the river to existing irrigation structures and their condition and <br />performance; <br />• The protection of lives and property; <br />• The protection of channel and flood plain from flood damage; <br />• The maintenance of river channel and over bank capacity; <br />• The ability to meet the Rio Grande Compact requirements. <br />The 2001 Study found the primary cause of degradation to be sedimentation and identified <br />measures that could be implemented to holistically improve the river's functions. These <br />measures were of both "structural" in nature, such as riparian restoration or diversion <br />replacement, or relating to "policy or administrative measures" or "non — structural" measures, <br />such as grazing management practices or land use issues. Phase 2 seeks to implement these <br />actions in order to improve the function of the Rio Grande. <br />2.2 The 2007 Rio Grande Watershed Restoration Strategic Plan <br />In 2004 the need was identified for a well - defined Rio Grande Watershed Restoration Strategic <br />Plan (Strategic Plan). Completed in 2007, the Strategic Plan outlined priority projects for the <br />entire Rio Grande watershed in Colorado. Priority projects included: flood protection, riparian <br />and headgate improvements, grazing management, flow management, and future studies. The <br />Strategic Plan highlighted the importance of continued efforts to implement the <br />recommendations from the 2001 Study. <br />2.3 The Plaza Project — Phase 1: McDonald Ditch and Plaza Planning Project <br />In 2010 the President of the McDonald Ditch Company approached the RGHRP with the desire <br />to improve the condition and function of the McDonald Ditch diversion and headgate. Because <br />the 2001 Study identified other issues in this reach of the river, known as the Sevenmile Plaza, <br />other stakeholders in the area were invited to participate. The result was a study of the area to <br />determine, using a collaborative process, how to rehabilitate aging diversions, unstable <br />streambanks, and a damaged wetland. Phase 1, a 5 -month study, was administered through a <br />partnership between the Colorado Rio Grande Restoration Foundation and the McDonald Ditch <br />Company. This study engaged the design and engineering services of the Natural Resources <br />Conservation Service (MRCS) and created the Plaza Stakeholders. The Plaza Stakeholders <br />completed an assessment and analysis of design alternatives for the project elements within the <br />project area, a 2.8 -mile reach of the river. Deliverables of this study were: Plaza Plan: A plan <br />detailing the selected options for each project element, a timeline for implementation, possible <br />funding mechanisms, and administrative considerations; Preliminary designs for the first Phase <br />of implementation: Plaza Project — Phase 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.