Laserfiche WebLink
Emergency Loan Application and Feasibility Study Rough & Ready Irrigating Ditch Company <br />ENGINEERS ESTIMATE OF PROBABLE CONSTRUCTION COSTS <br />ROUGH & READY DITCH AND PALEMRTON DITCH DIVERSIONS RECONSTRUCTION <br />101101/3 <br />Item <br />Description <br />Quantity <br />Unit <br />Cost <br />Extension <br />1 <br />Mobilization @ 5% <br />1 <br />LS <br />$ 56,000 <br />$ 56,000 <br />2 <br />Site Preparation J Demolition <br />1 <br />LS <br />$ 30,000 <br />$ 30,000 <br />3 <br />Temporary River Diversionl Care of the River I Dewatering <br />1 <br />LS <br />$ 150,000 <br />$ 150,000 <br />4 <br />Right Abutment Earthwork <br />1 <br />LS <br />$ 25;000 <br />$ 25,000 <br />5 <br />Cutoff Across Creels <br />1 <br />LS <br />$ 175,000 <br />$ 175,000 <br />6 <br />Concrete Check Structure Across Creek <br />120 <br />CY <br />$ 1,000 <br />$ 120,000 <br />7 <br />Concrete Apron <br />75 <br />CY <br />$ 1,000 <br />$ 75,000 <br />8 <br />Riprap Downstream of Structure <br />250 <br />CY <br />$ 100 <br />$ 25,000 <br />9 <br />Riprap Upstream of Structure <br />950 <br />CY <br />$ 100 <br />$ 15,000 <br />10 <br />2'x2' Slide Gate <br />2 <br />EA <br />$ 7,000 <br />$ 14,000 <br />11 <br />Flumegate <br />1 <br />EA <br />$ 30,000 <br />$ 30,000 <br />12 <br />Diversion Structure Concrete <br />60 <br />CY <br />$ 1,000 <br />$ 60,000 <br />13 <br />Diversion Structure Meta( Work <br />1 <br />LS <br />$ 15,000 <br />$ 15,000 <br />14 <br />Diversion Structure Gate (6'x6' Slide Gate) <br />2 <br />EA <br />$ 20,000 <br />$ 40,000 <br />15 <br />Measurement Flume <br />2 <br />EA <br />$ 50,000 <br />$ 100,000 <br />16 <br />Ditch Earthwork <br />1 <br />LS <br />$ 200,000 <br />$ 200,000 <br />18 <br />Access Roads, Grading <br />1 <br />LS <br />$ 15,000 <br />$ 15,000 <br />19 <br />Seeding, Mulching, Fencing <br />1 <br />LS <br />$ 25,000 <br />$ 25,000 <br />Construction <br />Items <br />Subtotal $1,170,000 <br />Engineering <br />and Permitting <br />@ 20 %, $234,000 <br />Construction <br />and <br />Engineering <br />Subtotal $1,404,000 <br />Contingencies <br />@ 30% $421,000 <br />TOTAL $5,825,0[30 <br />