Laserfiche WebLink
Emergency Loan Application and Feasibility Study Rough & Ready Irrigating Ditch Company <br />Alternative 2 --- Rebuildiaiz.Collaboratively with Improvements. The Rough and Ready Ditch <br />and Palmerton Ditch already serve multiple users and interests including the shareholders of the <br />two companies, and the owners of Oligarchy Reservoir 41 and McCall Reservoir. In addition, <br />the Rubicon flumegate serves the interests of the St. Vrain Creep Corridor Committee for <br />preserving streamflow past the structure. At the Rough and Ready diversion, St. Vrain Creek is <br />in its pre -flood channel so there is no need for collaborative stream relocation. The selected <br />alternative below represents a collaborative rebuild with improvements. <br />Selected Alternative 3 Rebuild the Rough and Ready Ditch/Palmerton Ditch Diversion: The <br />project will reconstruct the damaged facilities in the saxn.e location, size and for the same <br />function as the pre -flood structure, with a combined conveyance section and the addition of a <br />bypass to the river to regulate diversions, and with improvements to provide a long lasting <br />installation. The rebuilt structure will provide a better hydraulic cutoff and energy dissipation <br />which should provide additional protection of the structure under future flood flow conditions. <br />The rebuilt headgates structure will combine the diversions for both ditches into one ditch with <br />one set of headgates at the river. A bypass channel with gates will return water to St. Vrain <br />Creek prior to the bifurcation of the two ditches. A bifurcation structure with gates for each <br />ditch will control the diversion into the Rough and Ready Ditch and into the Palmerton Ditch.. <br />Cost Estimate <br />Deere and Ault Consultants, Inc. provided the following Estimate of probable Cost as a budget <br />for the project. More refined estimates may be prepared as the project progresses. A more <br />detailed breakdown of estimated costs is attached. <br />Task <br />Cost <br />Design and Construction. <br />Engineering, Geoteelmical, <br />Surveying and Testing <br />$187,000 <br />Permitting <br />$47,000 <br />Construction <br />$1,170,000 <br />Subtotal <br />$1,404,000 <br />Contingency <br />$421,000 <br />Total <br />$1,$25,000 <br />Rough and Ready Irrigating Ditch Company is applying for a loan not to exceed $1,825,000. <br />The Company is also requesting grants under the CWCB Flood Recovery Grant Program. Any <br />grants awarded under that program would reduce the requested funds from this Emergency Loan. <br />