My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150372 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150372 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2015 3:44:13 PM
Creation date
2/4/2014 4:18:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-025
C150372
Contractor Name
Oligarchy Irrigation Company
Contract Type
Loan
Water District
5
County
Boulder
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Emergency Loan Application and Feasibility Study <br />Oligarchy Irrigation Company <br />ENGINEERS ESTIMATE OF PROBABLE CONSTRUCTION COSTS <br />OLIGARCHY DITCH DIVERSION RECONSTRUCTION <br />10110113 <br />Item <br />Description <br />Quantity <br />Unit <br />Cost <br />Extension <br />1 <br />Mobilization @ 5% <br />1 <br />LS <br />$ 38,000 <br />$ 38,000 <br />2 <br />Site Preparation I Demolition <br />1 <br />LS <br />$ 50,000 <br />$ 50,000 <br />3 <br />Temporary River Diversion/ Care of the River I Dewatering <br />1 <br />LS <br />$100,000 <br />$ 100,000 <br />4 <br />Cutoff Across Creek <br />1 <br />LS <br />$150,000 <br />$ 150,000 <br />5 <br />Concrete Check Structure Across Creek <br />110 <br />CY <br />$ 1,000 <br />$ 110,000 <br />6 <br />Concrete Apron <br />65 <br />CY <br />$ 1,000 <br />$ 65,000 <br />7 <br />Rip ap Downstream of Structure <br />250 <br />CY <br />$ 100 <br />$ 25,000 <br />8 <br />Riprap Upstream of Structure <br />150 <br />CY <br />$ 100 <br />$ 15,000 <br />9 <br />2`x2' Slide Gate <br />1 <br />EA <br />$ 7,000 <br />$ 7,000 <br />10 <br />Flumegate <br />1 <br />EA <br />$ 30,000 <br />$ 30,000 <br />11 <br />Diversion Structure Concrete <br />40 <br />CY <br />$ 1,000 <br />$ 40,000 <br />12 <br />Diversion Structure Metal Mork <br />1 <br />LS <br />$ 15,000 <br />$ 15,000 <br />13 <br />Diversion Structure Gates 6'x6' Slide Gate <br />2 <br />EA <br />$ 20,000 <br />$ 40,000 <br />14 <br />Return Flow Structure Concrete <br />10 <br />CY <br />$ 1,000 <br />$ 10,000 <br />15 <br />Return Flow Gate (6'x4'-) <br />1 <br />EA <br />$ 15,000 <br />$ 15,000 <br />16 <br />Return Flow Structure Metal Worm <br />1 <br />LS <br />$ 5,000 <br />$ 5,000 <br />17 <br />Ditch Earthwork <br />1 <br />LS <br />$ 50,000 <br />$ 50,000 <br />18 <br />Access Roads, Grading <br />1 <br />LS <br />$ 25,000 <br />$ 25,000 <br />19 <br />Seeding, Mulching, Fencing <br />1 <br />LS <br />$ 10,000 <br />$ 10,000 <br />Construction <br />Items <br />Subtotal <br />$800,000 <br />Engineering <br />and Permitting <br />@ 20 % <br />$160,000 <br />Construction <br />and <br />Engineering <br />Subtotal <br />$960,000 <br />Contingencies <br />@ 30% <br />$288,000 <br />TOTAL $1,248,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.