Laserfiche WebLink
Emergency Loan Application and Feasibility Study Oligarchy Irrigation Company <br />Name <br />Water <br />Court Case <br />Appropriation <br />Date <br />Adjudication <br />Date <br />Amount <br />(cfs or <br />AF) <br />Avg. <br />Annual <br />Yield (AF) <br />Oligarchy Ditch <br />CA1335 <br />6/1/1866 <br />6/2/1882 <br />43.95 cfs <br />8,270 <br />Odagarcb Dl ch <br />CA- 1-3.3 -5— <br />__TZ/ 71 °870 <br />—612-/T992---9-8-,6-5 <br />cfs <br />Oligarchy Ditch <br />CA1335 <br />m 3���7 <br />6C2 /T&& <br />36,84­6-f <br />Oligarchy Ditch <br />CA1335 <br />4/1/1874 <br />6/2/1882 <br />58.07 cfs <br />Union Reservoir <br />CA4790 <br />10/6/1902 <br />3/13/1907 <br />13,219AF <br />3,830 <br />Union Reservoir <br />W7486 <br />5/1/1973 <br />3/11/1977 <br />5,879 AF <br />McIntosh Reservoir <br />CA4790 <br />10/8/1902 <br />3/13/1907 <br />2460 AF <br />1,510 <br />McIntosh Reservoir <br />CAI 1715 <br />12/31/1929 <br />7/23/1951 <br />2460 AF <br />Note: Yields of the separate water right have never been aeterrninea. J nererore, Hverage i- ),1uJua, z xlub uuz�ul cuuv <br />above are the historical average amounts for each structure based on Water Court transfer proceedings. Union and <br />McIntosh yields are at the reservoirs. Due to differing periods of record, the yields above are not equal to the <br />average annual diversions presented in the Agency /Company information shown previously. <br />Project Description <br />The project goal is to reconstruct the Oligarchy Ditch diversion structure on St. Vrain Creek that <br />was destroyed by the September 12 – 16, 2013 flood, including the diversion darn, the sand gate, <br />the Rubicon flumegate, the headgates, and the bypass gate. The Company has retained Deere <br />and Ault Consultants, Inc. and their licensed Professional Engineers to provide design and <br />construction review services. <br />Alternative 1 --- Do Nothin : This alternative is considered unacceptable. Failure to replace the <br />Oligarchy Ditch diversion structure would prevent the diversion of the Company's water rights <br />and the inability to uphold the Company's responsibility to deliver Union Reservoir and <br />McIntosh Reservoir water rights to those respective storage facilities. <br />Alternative 2 – Rebuilding Collaboratively with Improvements: The Oligarchy Ditch already <br />serves multiple users and interests including its shareholders and the owners of McIntosh <br />Reservoir and Union Reservoir. In addition, the Rubicon flumegate serves the interests of the St. <br />Vrain Creek Corridor Committee for preserving streamflow past the structure. Because of the <br />relatively isolated location of the Oligarch Ditch diversion, there is no feasible means of serving <br />additional multiple interests. The nearest headgates are nearly one mile upstream and nearly one <br />mile downstream. The next downstream diversion is on the opposite side of St. Vrain Creek. At <br />the Oligarchy Ditch diversion, St. Vrain Creek is currently in its pre -flood channel so there is no <br />need for collaborative stream relocation. The selected alternative below represents a <br />collaborative rebuild with improvements. <br />