My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150375 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150375 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2015 11:15:51 AM
Creation date
2/4/2014 4:07:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-010
C150375
Contractor Name
Consolidated Home Supply Ditch and Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Emergency Loan Application and Feasibility Study <br />Consolidated Home Supply Ditch and Reservoir Company[BORROWER] <br />Cost Estimate <br />The Project cost estimate, provided by Deere & Ault Consultants, is $1,535,928 and is further <br />broken down as follows: <br />(Note: Additional cost breakdown should be provided as an attachment.) <br />Task Cost <br />Design $87,190 <br />Permitting <br />Construction $1,105,350 <br />Other $87,400 <br />Contingency $255,988 <br />Total $1,535,928 <br />Consolidated Home Supply Ditch and Reservoir Company is applying for a loan not to exceed <br />$1,600,000. <br />See attached Engineer's Estimate of Probable Cost. <br />Financial Analysis <br />The Consolidated Home Supply Reservoir & Ditch Company has $525,608.24 in existing debt as <br />summarized below: <br />Lender Original <br />Balance <br />Current <br />Balance <br />Annual <br />Payment <br />Maturity <br />Date Collateral <br />USDA 650,000 99,017.74 27,157.00 12/10/15 assessments <br />CWCB 533,000 426,590.50 29,024.00 03/01/34 assessments <br />The Consolidated Home Supply Ditch and Reservoir Company's sources of income include: <br />Refer to financial statements attached, shareholders list. <br />Schedule <br />Construction of the Project is expected to commence by December 1, 2013 or sooner. Project <br />completion is estimated to occur by April 1, 2014. A temporary coffer dam is in place so that the <br />Consolidated Home Supply Ditch and Reservoir Company can divert water to Lone Tree, <br />Mariano, Lon Hagler Reservoirs using our No. 1 priority from the river on November 1, 2013. <br />The City of Loveland only has enough water stored for 6 months. They also need this structure <br />repaired. <br />Economic, Social, and Environmental Effects <br />If this structure isn't repaired this winter, farmers in portion of Larimer and Weld Counties will <br />not be able to plant their crops - thus local agriculture will not exist and local farmers will go
The URL can be used to link to this page
Your browser does not support the video tag.