Laserfiche WebLink
Feasibility for New Pipe Line Construction <br /> For <br /> The May Lateral <br /> ..:..4,." '''''', <br /> - J � .. rte' ,. <br /> fi <br /> F <br /> • <br /> M J=. <br /> r _ � <br /> Current Head Gate Structure for the May Lateral <br /> (MVIC) <br /> Prepared by <br /> Jim Siscoe FEASIBILITY STUDY APPROVAL <br /> General Manager Pursuant to Colorado Revised Statutes 37-60-121 &122,and <br /> In accordance with •.•ides adopted :• + : Board, the <br /> March 2007 CWCB s as • emu -d this F"- •ility Study meets all <br /> applica I require ents f•r appr, . <br /> ` 7�17//1/61 Sig d Date <br />