My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150251 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150251 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:27:41 PM
Creation date
1/24/2014 2:28:28 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150251
Contractor Name
Montezuma Valley Irrigation Company
Contract Type
Loan
County
Montezuma
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br /> Colorado Water Conservation Board �kRCONS.e.ip <br /> Department of Natural Resources c0 ` ' <br /> �"(,-� <br /> 1313 Sherman Street,Room 721 ¢(T ?±, ,.1 <br /> Denver,Colorado 80203 0• 4 J� <br /> Phone:(303)866-3441 <br /> FAX (303)866-4474 �1�: " <br /> � �1876...�-' e <br /> www.cwcb.state.co.us •1 9 3 2 • , <br /> July 16, 2007 Bill Ritter,Jr. <br /> Governor <br /> Harris D.Sherman <br /> Jim Siscoe, General Manager Executive Director <br /> Montezuma Valley Irrigation Company Dan McAuliffe <br /> 11501 Hwy 491 Acting Director <br /> Cortez, CO 81321 <br /> RE: May Lateral Pipeline Project <br /> Dear Mr. Siscoe: <br /> I am pleased to inform you that on July 11,2007,the Colorado Water Conservation Board(CWCB) <br /> approved your loan request. We understand that the loan will be used to pay for the design and <br /> installation of pipe,meters,vents, and other appurtenances in the construction of the May Lateral <br /> Pipeline Project. <br /> The Board approved a loan not to exceed$5,292,400 (5,240,000 for project costs and$52,400 for the <br /> 1%Loan Service Fee)with loan terms of 2.25%per annum for 30 years. I have attached a copy of the <br /> updated Board memo that includes the Board's approval of the Staff Recommendations. The Board <br /> approval includes supplemental conditions that must be met before a Loan Contract can be executed. In <br /> addition,the Board has required the loan contract include language which requires all funds received <br /> from NRCS related to the May Lateral Pipeline Project be applied to the Project and the CWCB loan. <br /> When the Board approves a loan there remain several conditions: <br /> a) Feasibility Study: Kirk Russell has reviewed the study titled "Feasibility for New Pipe <br /> Line Construction for the May Lateral, March, 2007". The approved study, in <br /> combination with the CWCB Board Memo revised July 16,2007,will meet the <br /> requirements of the CWCB Construction Fund Guidelines for loan feasibility studies. <br /> b) Contracting: An approved contract must be in place before funds can be advanced. <br /> Vaughn McWilliams will initiate the loan contracting process for this project. Once the <br /> contract is finalized the Company may request loan funds to cover eligible project <br /> expenses.You can contact Vaughn at (303) 866.3462 regarding the requirements. <br /> c) Design/Construction: You must adhere to the CWCB Design and Construction <br /> Administration Procedures. Tim Feehan will contact you regarding the requirements <br /> concerning construction.Tim will make construction site visits,which will be the basis <br /> of pay estimates for disbursement of your loan funds. You can contact Tim at his office <br /> at(303) 866.3480 or cell phone (303) 618.5010. <br /> Flood Protection•Water Supply Planning and Finance•Stream and Lake Protection <br /> Water Supply Protection•Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.