Laserfiche WebLink
TABLE 2 <br /> OPINION OF COST <br /> PLATTE VALLEY RESERVOIR NO. 1 <br /> ALTERNATIVE 1 <br /> 10:1 SLOPES-RESERVOIR VOLUME 431 A-FT. <br /> Item No. Description Qty Units Unit Price Amount <br /> 1 Mobilization,Insurance,Bonds 1 L.S. $ 61,582 $ 61,582 <br /> 2 Dam Construction <br /> Stripping 65 Acres $ 1,000.00 $ 65,000 <br /> Reservoir Excavation 374000 C.Y. $ 1.20 $ 448,800 <br /> Embankment Fill 168000 C.Y. $ 2.00 $ 336,000 <br /> Core Trench Excavation 23000 C.Y. $ 1.50 $ 34,500 <br /> Core Trench Fill 23000 C.Y. $ 1.50 $ 34,500 <br /> Clay Liner 56467 C.Y. $ 1.50 $ 84,700 <br /> Spoil 76472 C.Y. $ 0.75 $ 57,354 <br /> Riprap 0 Tons $ 28.00 $ - <br /> Riprap Bedding 0 Tons $ 24.00 $ - <br /> Top Soil&Seeding 23 Acres $ 2,500.00 $ 56,560 <br /> Dam Crest Gravel 2141 Tons $ 22.00 $ 47,109 <br /> 3 Ditch Control Structure <br /> Excavation&Backfill 250 C.Y. $ 10.00 $ 2,500 <br /> Concrete 85 C.Y. $ 525.00 $ 44,625 <br /> Riprap 150 Tons $ 28.00 $ 4,200 <br /> Riprap Bedding 50 Tons $ 24.00 $ 1,200 <br /> Gates 2 Ea $ 15,000.00 $ 30,000 <br /> 4 Dam Outlet&Spillway <br /> Outlet Pipe(48"RCP) 100 L.F. $ 400.00 $ 40,000 <br /> Gate/Operator/Thimble 1 L.S. $ 25,000.00 $ 25,000 <br /> Inlet Structure 40 C.Y. $ 600.00 $ 24,000 <br /> Walkway/Grates/Handrail 1 L.S. $ 20,000.00 $ 20,000 <br /> Riprap 850 Tons $ 28.00 $ 23,800 <br /> Riprap Bedding 300 Tons $ 24.00 $ 7,200 <br /> 5 Ditch Relocation <br /> Stripping 6 Acres $ 1,000.00 $ 6,000 <br /> Cofferdam Construction 1 L.S. $ 1,500.00 $ 1,500 <br /> Dewatering 60 Days $ 250.00 $ 15,000 <br /> Excavation 10000 C.Y. $ 2.00 $ 20,000 <br /> Fill 34000 C.Y. $ 2.00 $ 68,000 <br /> Seepage Control&Cutoff Excavation 4000 C.Y. $ 2.00 $ 8,000 <br /> Riprap 236 Tons $ 28.00 $ 6,611 <br /> Riprap Bedding 118 Tons $ 24.00 $ 2,832 <br /> Top Soil&Seeding 3 Acres $ 2,500.00 $ 7,500 <br /> 6 Bifurcation Structure <br /> Demolition/Repair I L.S. $ 5,000.00 $ 5,000 <br /> Concrete 75 C.Y. $ 525.00 $ 39,375 <br /> FRICO Gates 2 L.S. $ 18,000.00 $ 36,000 <br /> Evans No.2 Gate-Refurbish Gate 1 L.S. $ 3,000.00 $ 3,000 <br /> 18"Head Gate I L.S. $ 1,000.00 $ 1,000 <br /> Headgate Headwall 1.5 C.Y. $ 600.00 $ 900 <br /> 18"RCP 25 L.F. $ 40.00 $ 1,000 <br /> Parshall Flume&Headwall 1 L.S. $ 1,500.00 $ 1,500 <br /> Riprap 115 Tons $ 28.00 $ 3,220 <br /> Riprap Bedding 40 Tons $ 24.00 $ 960 <br /> 7 Measuring Structures-Three 15'Parshall Flumes <br /> Concrete 204 C.Y. $ 500.00 $ 102,000 <br /> Excavation&Backfill 900 C.Y. $ 15.00 $ 13,500 <br /> Riprap 300 Tons $ 28.00 $ 8,400 <br /> Riprap Bedding 100 Tons $ 24.00 $ 2,400 <br /> 8 Site Work <br /> Cap Exiting Wells 2 L.S. $ 2,500.00 $ 5,000 <br /> Move Existing Gas Lines 75 L.F. $ 150.00 $ 1 1,250 <br /> Remove Power Line 1 L.S. $ 2,500.00 $ 2,500 <br /> TOTAL CONSTRUCTION COST $ 1,821,078 <br /> 15%Contingency $ 273,162 <br /> Engineering,Surveying $ 225,000 <br /> Land Aquisition $ 309,360 <br /> TOTAL COST $ 2,628,600 <br />