My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150357 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150357 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 2:51:53 PM
Creation date
1/14/2014 10:41:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150357
Contractor Name
Boulder and Left Hand Irrigation Company
Contract Type
Loan
Water District
6
County
Boulder
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 10—DISBURSEMENT SCHEDULE <br /> For Project costs: The BORROWER shall prepare a periodic progress report which <br /> contains a statement of the PROJECT costs expended for that period and shall <br /> forward said statement to the CWCB. After receipt of the periodic progress report <br /> from the BORROWER, and review and acceptance of the items therein as eligible <br /> expenses as described below, the CWCB will pay to the BORROWER the amount set <br /> forth in the report or such portion that has been approved by the CWCB. Such <br /> payment shall be made within thirty (30) days from the CWCB's approval of each <br /> progress report. <br /> SECTION 11 —TIME FOR PERFORMANCE <br /> PROJECT Beginning: Upon Effective Date of this CONTRACT (the date this <br /> CONTRACT is signed by the State Controller or his designee). <br /> PROJECT Finish: June 30, 2014 <br /> [THE REST OF THIS PAGE INTENTIALLY LEFT BLANK] <br /> Appendix 1 to Loan Contract C150357 <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.